InterNACHI


Go Back   InterNACHI Inspection Forum > Specific Inspection Topics > Electrical Inspections

Notices

Electrical Inspections Contains discussions about electrical systems. This includes receptacles, panels, wiring, etc.

 
Reply
 
LinkBack Thread Tools
  #1  
Old 10/19/06, 11:30 AM
DSuelflow DSuelflow is offline
New User
 
Join Date: Jan 2006
Location: Eden, NC
Posts: 25
Please Note: DSuelflow is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default 3 Panel Setup

I came across this first timer yesterday and was wondering about its setup. The main disconnect (P1) is in it’s own box, making the others “subs”. The older sub (P2) is the original two-wire box and the newer one (P3) handles all the newer three-wire circuits. In P2 there is a 220 circuit in the lower right corner with the ground wire attached to the neutral buss, is this kosher? Don’t the neutrals and grounds need to be isolated in P3? There are plenty of other issues that an electrician will be called in so I’m covered, but I would like to explain it in my report in an intelligent way that covers the bases. Many thanks in advance from a long time fan.
Attached Thumbnails
3-panel-setup-2061-full.jpg   3-panel-setup-2061-p1.jpg   3-panel-setup-2061-p2.jpg   3-panel-setup-2061-p3.jpg  
Reply With Quote
  #2  
Old 10/19/06, 11:36 AM
Jeffrey R. Pope's Avatar
Jeffrey R. Pope Jeffrey R. Pope is offline
InterNACHI Member
 
Join Date: Aug 2003
Location: Santa Clarita, CA
Posts: 8,047
Default Re: 3 Panel Setup

Neutrals are not to be grounded at any point other than the service equipment. Exceptions apply, but not in this case. . .



IF YOUR INSPECTOR IS NOT USING THERMAL IMAGING, YOU'RE NOT GETTING THE WHOLE PICTURE ®
Jeff Pope
JPI Home Inspection Service
Santa Clarita CA
(661) 212-0738
Santa Clarita Home Inspection
http://www.MyInspector.net


Reply With Quote
  #3  
Old 10/19/06, 12:20 PM
jclark1's Avatar
jclark1 jclark1 is offline
Active Poster
 
Join Date: Nov 2005
Location: Vashon, Wa
Posts: 644
Please Note: jclark1 is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: 3 Panel Setup

Unusual to use a fused disconnect like that in a house.
Reply With Quote
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
National Electrical Code Information and Discussion jtedesco1 Electrical Inspections 50 6/15/10 7:28 PM
Panel Inspection Safety roconnor Electrical Inspections 10 9/24/06 9:02 PM
Bad electrical problem Pest Guy Electrical Inspections 4 1/20/06 9:26 PM


All times are GMT -4. The time now is 4:34 AM.


Popular Sections

:

All Sections

Inspection News

InterNACHI Membership

Inspection Standards

Inspection Education

InterNACHI Inspectors

Inspection Links

 

 

 

NACHI.ORG Statistics

 

 

no new posts