Old 4/10/07, 11:21 PM
Paul W. Abernathy Paul W. Abernathy is offline
InterNACHI Member
 
Join Date: Sep 2005
Location: Spotsylvania, VA
Posts: 8,072
Send a message via AIM to pabernathy Send a message via MSN to pabernathy Send a message via Skype™ to pabernathy
Default Re: Aluminum Wiring Fix

Safety fella...Safety.......the HI's who use "UP TO CODE" are always asking for trouble...



Paul W. Abernathy
Reply With Quote
  #32  
Old 4/11/07, 8:19 PM
Mike Whitt's Avatar
Mike Whitt Mike Whitt is offline
Unmoderated Guest
 
Join Date: Sep 2005
Location: North Carolina
Posts: 477
Please Note: Mike Whitt is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Aluminum Wiring Fix

Quote:
Originally Posted by pabernathy
If I spent every part of my time making sure my NEC posts met all possible local things....and every state I would simply go mad.


Go??????????
I though that you were already there!!!! lol
Reply With Quote
  #33  
Old 4/11/07, 10:43 PM
whandley's Avatar
whandley whandley is offline
Active Poster
 
Join Date: Sep 2004
Location: Laguna Niguel, CA
Posts: 2,091
Please Note: whandley is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Aluminum Wiring Fix

Quote:
Originally Posted by pabernathy
Greg.....I disagree...the GFI built into all AFCI's now aid in this problem and cutler hammer for example DOES protect against series arcs in the level 2 of the protection......and before the end of the year it will be in combination as well.

GFI does offer an element of protection that is part of all AFCI's that are produced right now and it is only going to be more advanced by the 2008 deadline.

Cutler Hammer has also introduced the Ul Classified versions of many other brands that are compatible right now and they do offer GFI protection within them.....others will follow AND just because you have Series issues is it NOT possible that branch parrallel issues could not also be an issue....then AFCI's are an added level of protection as well.

Do you for a second believe if the client is going to spend the money to upgrade the panel beyond FPE that they are going to spend the extra 6-10,000 dollars in whole house rewiring.......if we are working on a level of some protection is better than none.....AFCI's do offer a level of protection as well as a fully functional OCPD and so on....and even many now have AFCI and GFCI built in with the 5 MA status.......

I know for a fact by the end of the year the AFCI for Cutler Hammer ( and the UL Classified ) models will be compliant and meet combination standards....but AFCI's right now do work on series arcs at the branch level.....
Probably not a complete re-wire but maybe this as an option:

http://www.cpsc.gov/CPSCPUB/PUBS/516.pdf

http://www.cpsc.gov/CPSCPUB/PREREL/prhtml03/03120.html

I include both links in an inspection report where AL branch wiring is present.
Reply With Quote
  #34  
Old 4/12/07, 10:14 PM
Paul W. Abernathy Paul W. Abernathy is offline
InterNACHI Member
 
Join Date: Sep 2005
Location: Spotsylvania, VA
Posts: 8,072
Send a message via AIM to pabernathy Send a message via MSN to pabernathy Send a message via Skype™ to pabernathy
Default Re: Aluminum Wiring Fix

Quote:
Originally Posted by Mike Whitt

Go??????????
I though that you were already there!!!! lol
lol....Mike.....I hear ya......the NEC makes it happen as it burns the brain cells...



Paul W. Abernathy
Reply With Quote
  #35  
Old 4/25/07, 9:04 AM
Peter W. Bennett Peter W. Bennett is offline
InterNACHI Member
 
Join Date: Mar 2005
Location: Little Silver, NJ
Posts: 546
Default Re: Aluminum Wiring Fix

Does anyone know who manufactured "Ameriflex" and is it AL wiring? The home I inspected two days ago had a conductor in the attic that I could not phyisically get to for a closer examination.
Thanks, Peter
Reply With Quote
  #36  
Old 4/25/07, 12:11 PM
Greg Fretwell Greg Fretwell is offline
Active Poster
 
Join Date: Jul 2004
Location: Estero Florida
Posts: 1,798
Please Note: Greg Fretwell is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Aluminum Wiring Fix

When I read the CPSC articles I always wonder how much AMP/Tyco paid for that bribe ... opps, "lobbying effort".
CPSC is a political organization not a nationally recognized testing lab.
These are the same people who brought us the 1974 "seatbelt interlock" that prevented your car from starting
Reply With Quote
  #37  
Old 4/25/07, 2:51 PM
tdietrich1's Avatar
tdietrich1 tdietrich1 is offline
InterNACHI Member
 
Join Date: Oct 2006
Location: Northampton County - Pa
Posts: 1,954
Send a message via Yahoo to tdietrich1
Default Re: Aluminum Wiring Fix

The CPSC, helped me get my furnace replaced by informing the manufacturer of their responsiblities.

So not a political organization.

tom
Reply With Quote
  #38  
Old 4/25/07, 9:54 PM
Greg Fretwell Greg Fretwell is offline
Active Poster
 
Join Date: Jul 2004
Location: Estero Florida
Posts: 1,798
Please Note: Greg Fretwell is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Aluminum Wiring Fix

From CPSC.GOV

Quote:
Q.Who heads CPSC?A. </B>The agency is headed by three commissioners nominated by the President and confirmed by the Senate for staggered seven-year terms. The President designates one of the commissioners as Chairman
Sounds pretty "political" to me.
Reply With Quote
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Aluminum Wiring jhagarty Electrical Inspections 23 10/5/07 2:56 AM
Aluminum Wiring acox Electrical Inspections 4 8/26/07 11:24 PM
Nice Report on AL Wire Terminations - Enjoy pabernathy Electrical Inspections 0 7/2/07 12:35 PM
Reporting Aluminum Wiring Richard Seay Electrical Inspections 3 2/28/07 4:27 PM
Aluminum Wiring homeowner001 Electrical Inspections 36 7/7/06 1:08 AM


All times are GMT -4. The time now is 5:30 AM.


Popular Sections

:

All Sections

Inspection News

InterNACHI Membership

Inspection Standards

Inspection Education

InterNACHI Inspectors

Inspection Links

 

 

 

NACHI.ORG Statistics

 

 

no new posts