InterNACHI


Go Back   InterNACHI Inspection Forum > Specific Inspection Topics > Electrical Inspections

Notices

Electrical Inspections Contains discussions about electrical systems. This includes receptacles, panels, wiring, etc.

 
Reply
 
LinkBack Thread Tools
  #1  
Old 4/1/09, 9:05 AM
John Evans John Evans is offline
InterNACHI Member
 
Join Date: Aug 2005
Location: Bel Air, MD
Posts: 848
Default Back Up Generator

I have an inspection scheduled tomorrow at a home with a back up propane generator. Should I attempt to test it?




[Maryland Home Inspections
www.aimhomeinspection.com
Infraspection Certified Level 1 No. 7801
Reply With Quote
Find an InterNACHI certified Tennessee Home Inspector (and anywhere else in North America)
  #2  
Old 4/1/09, 11:23 AM
Scott F. Coslett Scott F. Coslett is offline
InterNACHI Member
 
Join Date: Mar 2005
Location: Berwick, PA
Posts: 193
Default Re: Back Up Generator

If the home owner was present I'd ask them to demonstrate its operation. If this is not a possibility, my advise to you would be to recommend the installer or an appropriate technician inspect and operate it. Reading between the lines of your post, I'm gathering you probably haven't seen too many of these......As such, stay within your comfort zone.



Scott Coslett
National Property Inspections
Berwick, PA
www.PennInspector.com
scoslett@pa.metrocast.net


"Life is Tough. Its even tougher if you're stupid" John Wayne
Reply With Quote
  #3  
Old 4/1/09, 11:29 AM
James H. Bushart's Avatar
James H. Bushart James H. Bushart is offline
InterNACHI Member
 
Join Date: Dec 2004
Location: Southwest Missouri
Posts: 20,956
Default Re: Back Up Generator

II. The inspector is not required to:
A. Insert any tool, probe or device into the main panelboard, sub-panels, distribution panelboards, or electrical fixtures.
B. Operate electrical systems that are shut down.
C. Remove panelboard cabinet covers or dead front covers if they are not readily accessible.
D. Operate or reset overcurrent protection devices or overload devices.
E. Operate non-accessible smoke detectors.
F. Measure or determine the amperage or voltage of the main service equipment if not visibly labeled.
G. Inspect the fire or alarm system and components.
H. Inspect the ancillary wiring or remote control devices.
I. Activate any electrical systems or branch circuits which are not energized.
J. Inspect low voltage systems, electrical de-icing tapes, swimming pool wiring or any time-controlled devices.
K. Verify the service ground.
L. Inspect private or emergency electrical supply sources, including but not limited to generators, windmills, photovoltaic solar collectors, or battery or electrical storage facility.
M. Inspect spark or lightning arrestors.
N. Inspect or test de-icing equipment.
O. Conduct voltage drop calculations.
P. Determine the accuracy of labeling.
Q. Inspect exterior accent lighting.




James H. Bushart

Professional Building Analyst, BPI
Missouri, Kansas and Arkansas
314-803-2167
Reply With Quote
  #4  
Old 4/1/09, 12:13 PM
Joe Funderburk, CMI's Avatar
Joe Funderburk, CMI Joe Funderburk, CMI is offline
InterNACHI Member
 
Join Date: Dec 2005
Location: Hickory Grove, SC
Posts: 8,343
Send a message via Yahoo to jfunderburk
Default Re: Back Up Generator

The search tool works great.

http://www.nachi.org/forum/f19/inspe...erators-38450/



“The things that will destroy America are peace at any price,
prosperity at any cost, safety first instead of duty first,
the love of soft living, and the get-rich-quick theory of life.”
Theodore Roosevelt


Joe Funderburk, CMI
Alpha & Omega Home Inspections, LLC
Inspecting Upstate SC & Charlotte Metro, NC
NACHI ID: NACHI05120170
www.aohomeinspection.com


Reply With Quote
  #5  
Old 4/5/09, 12:55 PM
Paul W. Abernathy Paul W. Abernathy is offline
InterNACHI Member
 
Join Date: Sep 2005
Location: Spotsylvania, VA
Posts: 8,072
Send a message via AIM to pabernathy Send a message via MSN to pabernathy Send a message via Skype™ to pabernathy
Default Re: Back Up Generator

While not required...if you really want to do anything just make sure it starts up properly and runs. Otherwise, thats about all you can do without going into way to much liability detail.



Paul W. Abernathy
Reply With Quote
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Here's why you should pull back insulation on the rim joist. bhamilton General Inspection Discussion 6 3/23/09 9:49 PM
A New Wrinkle - Banks Refusing To Take Back Foreclosed Properties jburkeson1 Miscellaneous Discussion for Inspectors 9 3/10/09 11:11 AM
CMI imposter? jbraun Certified Master Inspector (CMI) Discussion 118 11/26/07 4:55 PM
Back-up Generator Installation krichardson Electrical Inspections 5 10/12/07 11:51 AM
Generator sub-panel. gporter Electrical Inspections 9 5/18/07 9:53 PM


All times are GMT -4. The time now is 5:37 AM.


Popular Sections

:

All Sections

Inspection News

InterNACHI Membership

Inspection Standards

Inspection Education

InterNACHI Inspectors

Inspection Links

 

 

 

NACHI.ORG Statistics

 

 

no new posts