InterNACHI


Go Back   InterNACHI Inspection Forum > Specific Inspection Topics > Electrical Inspections

Notices

Electrical Inspections Contains discussions about electrical systems. This includes receptacles, panels, wiring, etc.

 
Reply
 
LinkBack Thread Tools
  #1  
Old 4/26/07, 12:27 AM
Peter Doane's Avatar
Peter Doane Peter Doane is offline
InterNACHI Member
 
Join Date: Dec 2005
Location: Olympia, WA
Posts: 2,055
Default Comments on this set up

- Zinsco panel in a detached garage (main for the manufactured home).
- 4 poll main breaker
- Three splits under the main breaker, (1) down to the panel below, (2) out to the manufactured home, (3) could not trace where its going.

First time I've seen a set up like this, was hoping you electrical vets had any comments other then the normal zinsco - blah, blah.

Thanks
Attached Thumbnails
comments-set-up-070425-01-036.jpg   comments-set-up-070425-01-037.jpg  



Peter Doane
Realty Check Inspection Service
NACHI ID# 05120681
Reply With Quote
  #2  
Old 4/26/07, 12:46 AM
Marc D. Shunk's Avatar
Marc D. Shunk Marc D. Shunk is offline
Banned
 
Join Date: Dec 2006
Location: Central PA
Posts: 1,980
Please Note: Marc D. Shunk is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Comments on this set up

That's a pretty freaking weird panel. That's not a 4-pole main breaker. That's two, two pole breakers. One, for a subfeed breaker, and one to take care of the branch breakers in the lower section. A 200 amp feed hits those main lugs on top, then it goes through two double pole, 100 amp breakers. That's 100 amps for the subfeed breaker, and 100 amps for the branch breaker buss below.

It appears the main breaker on the left there is double-tapped. Once, for another subfeed, and once to go down the the buss for the branch breakers.

Last edited by Marc D. Shunk; 4/26/07 at 1:02 AM..
Reply With Quote
  #3  
Old 4/26/07, 1:06 AM
jbreazeale jbreazeale is offline
Active Poster
 
Join Date: Aug 2006
Location: Sardis, MS
Posts: 618
Please Note: jbreazeale is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Comments on this set up

Dang, Marc, you must LIVE on this board!! LOL!! Anyway, for the record I concur with your assessment. Gotta call out that double tap.....as if there was no way to avoid it! Geeze!
Reply With Quote
  #4  
Old 4/26/07, 1:22 AM
Peter Doane's Avatar
Peter Doane Peter Doane is offline
InterNACHI Member
 
Join Date: Dec 2005
Location: Olympia, WA
Posts: 2,055
Default Re: Comments on this set up

Quote:
Originally Posted by Marc D. Shunk
That's a pretty freaking weird panel. That's not a 4-pole main breaker. That's two, two pole breakers. One, for a subfeed breaker, and one to take care of the branch breakers in the lower section. A 200 amp feed hits those main lugs on top, then it goes through two double pole, 100 amp breakers. That's 100 amps for the subfeed breaker, and 100 amps for the branch breaker buss below.

It appears the main breaker on the left there is double-tapped. Once, for another subfeed, and once to go down the the buss for the branch breakers.
Marc,
The reason I called it a 4 pole was because I could not trip each double pole independently. All 4 trip together,.... and I could not find out where they tied together other then possibly internally and hence my deduction of a 4 pole.
Thanks for your insight!



Peter Doane
Realty Check Inspection Service
NACHI ID# 05120681
Reply With Quote
  #5  
Old 4/29/07, 9:28 PM
Frank L. Bartlo Frank L. Bartlo is offline
InterNACHI Member
 
Join Date: Aug 2004
Location: SE Michigan
Posts: 236
Default Re: Comments on this set up

All 4 trip together? That is hella weird.

"Howard, Fine, and Howard Electrical at your service" ... nyuk, nyuk, nyuk...

Can't make out whether the bottom left terminals are double-tapped or they are hard-wired connection off the mains passing under the "quadruple pole" breaker to the bottom bus... were they double-tapped, Peter?
Reply With Quote
  #6  
Old 4/29/07, 11:29 PM
Speedy Petey Speedy Petey is offline
Unmoderated Guest
 
Join Date: Jul 2006
Posts: 1,297
Please Note: Speedy Petey is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Comments on this set up

Quote:
Originally Posted by fbartlo
All 4 trip together? That is hella weird.
This is similar to many Siemens 200 amp main breakers. They used to use two 100 amp breakers in parallel to get the 200 amp two pole. All four handles were tied together.
I have one in my own home.
Reply With Quote
  #7  
Old 4/30/07, 5:53 PM
Marc D. Shunk's Avatar
Marc D. Shunk Marc D. Shunk is offline
Banned
 
Join Date: Dec 2006
Location: Central PA
Posts: 1,980
Please Note: Marc D. Shunk is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Comments on this set up

Quote:
Originally Posted by Speedy Petey
This is similar to many Siemens 200 amp main breakers. They used to use two 100 amp breakers in parallel to get the 200 amp two pole. All four handles were tied together.
I have one in my own home.
Yeah, but if you look at this panel, it only has the handles tied in two pairs. Weird.
Reply With Quote
  #8  
Old 4/30/07, 8:47 PM
Speedy Petey Speedy Petey is offline
Unmoderated Guest
 
Join Date: Jul 2006
Posts: 1,297
Please Note: Speedy Petey is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Comments on this set up

Oh. OK, I see it now.
Pretty much like the old fuse panels with the two pullouts at the top. One lighting main and one range.
Reply With Quote
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Furnace Problem Comments Welcome rfrost Inspecting HVAC Systems 28 10/21/07 6:26 PM
For those in favor of licensing gbeaumont Legislation, Licensing & Legal Issues for Inspectors 70 5/21/07 3:09 PM
Tidbits from the ASHI Message Board jbushart Miscellaneous Discussion for Inspectors 126 4/27/07 11:05 AM


All times are GMT -4. The time now is 2:23 AM.


Popular Sections

:

All Sections

Inspection News

InterNACHI Membership

Inspection Standards

Inspection Education

InterNACHI Inspectors

Inspection Links

 

 

 

NACHI.ORG Statistics

 

 

no new posts