Has anyone seen this done before?
The home main panel located in "attached garage" and remote panel in laundry was tapped into main bus bar. Thanks in advance for input. ************************************** Shawn Rowe, CMI HomeFirst Inspection Services, LLC - InfraRed Specialist (Level 1 & Building Science certified) - Code Certified Residential Building Inspector - Certified Master Inspector -- Serving NE Florida, St. Johns, Duval, Flagler, Putnam counties -- |
|
#2
|
||||
|
||||
|
Definitely a moisture/corrosion issue in that panel.
James H. Bushart Professional Building Analyst, BPI Missouri, Kansas and Arkansas 314-803-2167 |
|
#3
|
|||
|
|||
|
Please Note:
Speedy Petey is a non-member guest and is in no way affiliated with InterNACHI or its members.
Those taps are certainly NOT compliant
|
|
#4
|
||||
|
||||
|
What a mess...defer it.
|
|
#5
|
|||
|
|||
|
Please Note:
Marc Benz is a non-member guest and is in no way affiliated with InterNACHI or its members.
That type of tap is not allowed and second thing is the moistore issue I really suggest have a electrician come out and have them check the breaker box very carefully and IMO I rather have that replaced anyway.
Merci,Marc |
|
#6
|
|||
|
|||
|
Please Note:
wsiegel is a non-member guest and is in no way affiliated with InterNACHI or its members.
not to mention ground and neutrals under the same screw
|
|
#7
|
|||
|
|||
|
Please Note:
Greg Fretwell is a non-member guest and is in no way affiliated with InterNACHI or its members.
Electrically it is a legal feeder tap assuming the other rules are followed BUT it is a listing violation in that panel unless the label says you can do it.
Some panels do allow lugging onto the bus but there are usually tapped holes on the bottom, listed for the purpose. |
|
#8
|
|||
|
|||
|
Please Note:
Pierre Belarge is a non-member guest and is in no way affiliated with InterNACHI or its members.
Notice the neutral connection/lug in the upper right hand portion of the picture...it looks as though that was added at the same time as the phase conductors.
I am very curious as to how that may have been performed...If you have other pictures, maybe you can post them. |
![]() |
| Thread Tools | |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| What do you think? Can this work for you? | jtedesco1 | Electrical Inspections | 21 | 2/26/11 2:00 PM |
| Where is it written.... | bgromicko | General Inspection Discussion | 21 | 1/19/08 9:02 PM |
| Article 240 : Overcurrent Protection Article | pabernathy | Electrical Inspections | 0 | 5/23/07 11:40 AM |
| Need Help from the Learned... | gbrasseur | Electrical Inspections | 15 | 12/19/06 5:04 PM |