InterNACHI


Go Back   InterNACHI Inspection Forum > Specific Inspection Topics > Electrical Inspections

Notices

Electrical Inspections Contains discussions about electrical systems. This includes receptacles, panels, wiring, etc.

Reply
 
LinkBack Thread Tools
  #16  
Old 6/27/06, 11:32 PM
Greg Fretwell Greg Fretwell is offline
Active Poster
 
Join Date: Jul 2004
Location: Estero Florida
Posts: 1,798
Please Note: Greg Fretwell is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Electrical Inspection with Temp. Service?

I talked to my favorite builder and they can get a CO without a meter. Her company will not close without a meter but some companies in this county do. (with another POCO)
The customer has to get the POCO to set the meter.
All Lee county needs for the CO is a hot check with a generator after the trim (electrician's honor) and a final inspection with all the service equipment installed, up to the service point.
Reply With Quote
  #17  
Old 6/27/06, 11:41 PM
Greg Fretwell Greg Fretwell is offline
Active Poster
 
Join Date: Jul 2004
Location: Estero Florida
Posts: 1,798
Please Note: Greg Fretwell is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Electrical Inspection with Temp. Service?

My first house in Md was a classic. My builder shot himself the day our financing fell through with his lender (our closing date) so we just moved in. We finally closed with his estate many months later. I had my financing set up and I was just waiting for them to tell me who to give the check to.
I was very lucky that I had written in and had initialled, a line on my contract that said I could move in on the day we were supposed to close. I did it for apartment lease reasons but it ended up being free rent for 8 months.
Reply With Quote
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
"UFER" Ground? see last paragraph. jtedesco1 Electrical Inspections 19 8/23/11 4:56 PM
Download the videos here all about physics and electricity jtedesco1 Electrical Inspections 5 9/14/08 4:58 PM
PIC of State Rep and sponsor of new NACHI H.I. Bill in NH. gromicko Miscellaneous Discussion for Inspectors 53 8/30/06 6:58 PM
Some good questions that always need answers jtedesco1 Electrical Inspections 5 6/16/06 10:10 PM
Electrical Safety Information jtedesco1 Electrical Inspections 0 2/19/06 2:48 AM


All times are GMT -4. The time now is 1:50 PM.


Popular Sections

:

All Sections

Inspection News

InterNACHI Membership

Inspection Standards

Inspection Education

InterNACHI Inspectors

Inspection Links

 

 

 

NACHI.ORG Statistics

 

 

no new posts