InterNACHI


Go Back   InterNACHI Inspection Forum > Specific Inspection Topics > Electrical Inspections

Notices

Electrical Inspections Contains discussions about electrical systems. This includes receptacles, panels, wiring, etc.

 
Reply
 
LinkBack Thread Tools
  #1  
Old 10/28/09, 2:42 PM
David C. Macy's Avatar
David C. Macy David C. Macy is offline
InterNACHI Member
 
Join Date: Jan 2004
Location: NE. OH
Posts: 2,657
Default Equipment panels

Need some clarification on these panels.

The first one was improperly installed to high and obstructed by a shelf/storage.

The second one had some improper wiring practices.

The main panel had improper access to safely remove the cover.

I have some additional questions on this set up.

It looks like a range/dryer wire going to the exterior air condenser disconnect.
(This was also locked)

Data on the air condenser was not readable.

I get confused on the arrangement of a remote distribution panel or equipment over current protection.

Any additional information on this setup would be appreciated.

I differed to a sparky but posted for my benefit of learning.

And if P.Abernathy is around I am enjoying your book but my name is Macy and not Macey. (A common misspelling)
Attached Thumbnails
equipment-panels-remote-1.jpg   equipment-panels-remote-2.jpg   equipment-panels-149409-059-small-.jpg.jpg
Views:	99
Size:	29.4 KB
ID:	32923  
Reply With Quote
  #2  
Old 10/31/09, 2:03 PM
Patrick Bolliger's Avatar
Patrick Bolliger Patrick Bolliger is offline
InterNACHI Member
 
Join Date: Aug 2005
Location: Chicago, IL
Posts: 890
Send a message via Skype™ to pbolliger
Default Re: Equipment panels

What a mess!

Those are "power cutoff switches with fuses" that have been daisy chained from one feeder (from the "main panel"). You have plenty going on there.. I love the fact that they used one set of feeder wires to handle the A/C disconnect (probably a shock hazard) and then feeding another set of receptacles. There are so many problems here it's a total repair / replacement by a qualified electrical contractor deferral.

My question to you is what "set of fuses" blow first in this set up when both the A/C and the downstream receptacles are being used?
Reply With Quote
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Help. What is the correct way to report a breaker that is too big. gromicko Electrical Inspections 77 5/10/12 6:13 PM
What do you think? Can this work for you? jtedesco1 Electrical Inspections 21 2/26/11 2:00 PM
Download the videos here all about physics and electricity jtedesco1 Electrical Inspections 5 9/14/08 3:58 PM
Where is it written.... bgromicko General Inspection Discussion 21 1/19/08 9:02 PM
Dwelling and Commercial Electrical Equipment jtedesco1 Electrical Inspections 4 1/10/08 6:46 AM


All times are GMT -4. The time now is 3:31 AM.


Popular Sections

:

All Sections

Inspection News

InterNACHI Membership

Inspection Standards

Inspection Education

InterNACHI Inspectors

Inspection Links

 

 

 

NACHI.ORG Statistics

 

 

no new posts