InterNACHI


Go Back   InterNACHI Inspection Forum > Specific Inspection Topics > Electrical Inspections

Notices

Electrical Inspections Contains discussions about electrical systems. This includes receptacles, panels, wiring, etc.

 
Reply
 
LinkBack Thread Tools
  #1  
Old 6/16/06, 12:57 PM
jtedesco1 jtedesco1 is offline
Account Suspended Due to Excessive Complaints
 
Join Date: Dec 2005
Posts: 1,891
Please Note: jtedesco1 is a non-member guest and is in no way affiliated with InterNACHI or its members.
Cool Find out about what's happening for new electrical rules in the NEC

2008 ROP Articles and AnnexesInformation about the NFPA Code Process

Report on Proposals (ROP)

Proposals can be submitted for text to be amended or included in NFPA Codes and Standards. Following the Call for Proposals period, the responsible technical committee holds meetings over the course of three months to consider all the submitted proposals and listen to anyone wishing to address the committee regarding a proposal. The committee also develops its own proposals and incorporates them into their report. A two-thirds approval vote by letter ballot of the members of the Committee eligible to vote is required for Committee approval of the actions on the Proposals. Should the Committee revise or reject a Proposal in whole or in part, it must include in its report the reasons for this change or rejection. All the proposals are presented in the Report on Proposals (ROP). The ROP is published and widely distributed and anyone may download or request a copy. The committee members vote to approve or reject their report in the ROP by letter ballot, and if two-thirds of all committee members eligible approve, the process continues to the next step. If the ROP does not receive two-thirds approval, their report in the ROP returns to the committee.

Report on Comments (ROC)

After the ROP has received the necessary approvals, there is a 60-day comment period, during which time anyone may submit a public comment on the proposed changes in the ROP. The committee then reconvenes at the end of the 60-day period and decides how to act on all comments. Once again, the meeting is open to anyone who wishes to address the committee on a particular public comment. A two-thirds approval vote by letter ballot of the members of the committee eligible to vote is again required for approval of actions on the comment, and the committee must again publish reasons for revising or rejecting any public comments in a new report. This report in called the Report on Comments (ROC) and is available to anyone for review for a seven-week period.

Want to learn more? Read about the NFPA Code process.
Reply With Quote
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
"UFER" Ground? see last paragraph. jtedesco1 Electrical Inspections 19 8/23/11 3:56 PM
A thread for serious discussion of Washington Senate bill 5778 dhelm Legislation, Licensing & Legal Issues for Inspectors 236 3/11/07 3:45 AM
Dave Bottoms is a slme Ball rcooke Canadian Inspectors 4 10/11/06 9:01 PM
PIC of State Rep and sponsor of new NACHI H.I. Bill in NH. gromicko Miscellaneous Discussion for Inspectors 53 8/30/06 5:58 PM
Newsletter about electrical rules, etc. jtedesco1 Canadian Inspectors 1 2/16/06 10:15 PM


All times are GMT -4. The time now is 3:35 AM.


Popular Sections

:

All Sections

Inspection News

InterNACHI Membership

Inspection Standards

Inspection Education

InterNACHI Inspectors

Inspection Links

 

 

 

NACHI.ORG Statistics

 

 

no new posts