InterNACHI


Go Back   InterNACHI Inspection Forum > Specific Inspection Topics > Electrical Inspections

Notices

Electrical Inspections Contains discussions about electrical systems. This includes receptacles, panels, wiring, etc.

 
Reply
 
LinkBack Thread Tools
  #1  
Old 11/19/06, 7:08 PM
David C. Macy's Avatar
David C. Macy David C. Macy is online now
InterNACHI Member
 
Join Date: Jan 2004
Location: NE. OH
Posts: 2,658
Default Half a job!!

Would it of cost that much more to update the lower portion of the SEC below the meter?

Needs a exterior ground rod as well. The main panel was a FPE and a triple tap at the sub. I did notice the wires not being secured with the proper connectors as the leave the panel box
Attached Thumbnails
half-job-85906-cleveland-010-small-.jpg.jpg
Views:	108
Size:	58.8 KB
ID:	7069   half-job-85906-cleveland-026-small-.jpg.jpg
Views:	112
Size:	43.8 KB
ID:	7070  
Reply With Quote
  #2  
Old 11/19/06, 11:13 PM
Speedy Petey Speedy Petey is offline
Unmoderated Guest
 
Join Date: Jul 2006
Posts: 1,297
Please Note: Speedy Petey is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Half a job!!

You'd be appalled at what some folks want us to leave.

Possibly this was a mast repair or damage replacement. Possibly the H-O did not have the funds to do a complete job. Or maybe they were just cheap.
Reply With Quote
  #3  
Old 11/20/06, 10:59 AM
tdietrich1's Avatar
tdietrich1 tdietrich1 is offline
InterNACHI Member
 
Join Date: Oct 2006
Location: Northampton County - Pa
Posts: 1,954
Send a message via Yahoo to tdietrich1
Default Re: Half a job!!

I was at a job, where the building owner [ a landlord] was cited to change the SE Cables. From the POA down to the meter base. The cables [several apartments] were 'worn/old' and the building owner absolutely refused to get it all replaced. It seemed like he was adamant about not getting any work done without being cited.

It happens, you educated your customer, and they pay for what they are willing to pay for. Just as a contractor, you need to know when to just walk away.

tom
Reply With Quote
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Home Values Slashed in Half? jbushart Miscellaneous Discussion for Inspectors 5 7/1/07 10:50 AM
Inspector Advantage offers NACHI members half price for 6 months. gromicko Special Discounts for InterNACHI Inspectors 2 4/13/07 12:06 PM
Half Baked Idea phinsperger General Inspection Discussion 3 11/3/06 3:03 AM
Half of roof covered with ??? dmacy Exterior Inspections 5 6/5/06 8:58 PM
Black Pipe half way around house scosta Plumbing Inspections 10 1/22/06 6:27 PM


All times are GMT -4. The time now is 8:00 AM.


Popular Sections

:

All Sections

Inspection News

InterNACHI Membership

Inspection Standards

Inspection Education

InterNACHI Inspectors

Inspection Links

 

 

 

NACHI.ORG Statistics

 

 

no new posts