Question job cost

i was wondering what the average price is to sub-contract a residential house rough in by the square foot? i would like to get an idea about the cost with just the labour and no matterial, and the cost of everything together, eg. $1.00 per sqf w out material, $2.75 w matterial bought.

i live in the GTA of Ontario Canada, avg. price of 14/2= $140per 150m
Reply With Quote
  #2  
Old 12/18/06, 1:34 AM
John Q. Smith, #6 John Q. Smith, #6 is offline
New User
 
Join Date: Dec 2006
Posts: 2
Please Note: John Q. Smith, #6 is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: job cost

iam sorry i also forgot to ask about the price for extas such as potlights, sconce etc. thank u
Reply With Quote
  #3  
Old 12/18/06, 7:56 AM
Speedy Petey Speedy Petey is offline
Unmoderated Guest
 
Join Date: Jul 2006
Posts: 1,297
Please Note: Speedy Petey is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: job cost

I do NOT price by the sq/ft, but I do figure it after for a baseline. The last few I have done were in the $5-$6 (US) range out the door. This is well equipped, with several recessed lights, good bath fans, dimmers everywhere, etc.

I DO NOT work with folks who want to supply their own material. This is only asking for trouble for the contractor. If I were to do this I would have a solid contract stipulating that I can charge for ANY time lost due to miscommunication, forgotten material, etc.
It is a BAD (and ill conceived) way for a GC or homeowner to save a little money. All this does is take the SMALL profit margin on material away from the contractor.
Also, I have found these folks are looking to cheap out where ever it suits them and splurge on other things. Meaning, they will try to hammer me on my price, yet they will put a 42" plasma in every room.
Of course this is not the case every time, but I have seen it more often than not.
Reply With Quote
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Overstocked! NACHI Flashlights & Shirts at Cost! trausch Miscellaneous Discussion for Inspectors 17 8/7/07 12:24 AM
The Friggin Cost of Globalization jburkeson1 Miscellaneous Discussion for Inspectors 0 6/13/07 2:30 PM


All times are GMT -4. The time now is 3:25 AM.


Popular Sections

:

All Sections

Inspection News

InterNACHI Membership

Inspection Standards

Inspection Education

InterNACHI Inspectors

Inspection Links

 

 

 

NACHI.ORG Statistics

 

 

no new posts