A number of double taps but my question has to do with NEW wiring for future use and abandoned wiring. The large cable at the bottom has been run for a future heat pump. Wired and just cut in the box. The sheathing does extend about an inch past the conductors. The wire nuts at the right are abandoned baseboard heat wiring. Shouldn't those just be removed from the box?
Stephen Stanczyk Washington State Licensed Home Inspector # 221 President, Washington Association of Property Inspectors (WAPI) (253) 241-0602 calls answered until 10pm Pierce County -Thurston County - King County - Snohomish County Last edited by sstanczyk; 3/22/09 at 1:31 AM.. |
|
#2
|
||||
|
||||
|
I see these periodically.
There's no safety issue with these unused wires. |
|
#3
|
|||
|
|||
|
Please Note:
jtedesco1 is a non-member guest and is in no way affiliated with InterNACHI or its members.
True. You should also verify that their ends are not just left open and exposed, because field experience has shown where an installeronce connected those "spare wires" leaving energized ends.Check to see that they are safe and hopefully in a covered junction box.
|
![]() |
| Thread Tools | |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| National Electrical Code Information and Discussion | jtedesco1 | Electrical Inspections | 50 | 6/15/10 7:28 PM |
| Electrical Safety Foundation International Links | jtedesco1 | Electrical Inspections | 5 | 12/8/07 3:10 PM |
| Subpanel wired as main panel. | jlybolt | Electrical Inspections | 15 | 5/23/07 4:10 PM |
| Main disconnect at meter instead of main panel. OK? | kshepard | Electrical Inspections | 14 | 11/8/06 6:24 PM |
| Bad electrical problem | Pest Guy | Electrical Inspections | 4 | 1/20/06 9:26 PM |