Default Meter question

is schedule 40 pvc an acceptable conduit for underground service.

up to AHJ???

home built in 1997

see pic
Attached Thumbnails
meter-question-100_0707.jpg  
Reply With Quote
  #2  
Old 2/3/07, 2:40 PM
Paul W. Abernathy Paul W. Abernathy is offline
InterNACHI Member
 
Join Date: Sep 2005
Location: Spotsylvania, VA
Posts: 8,072
Send a message via AIM to pabernathy Send a message via MSN to pabernathy Send a message via Skype™ to pabernathy
Default Re: Meter question

BY todays standards...NOPE.......needs to be SCH 80 if subject to damage.

NOW that IS up to the AHJ to determine, generally SCH. 80 was clearly defined in the 2002 NEC and loosely defined before that so I would not be overly concerned on this being Sch. 40.



Paul W. Abernathy
Reply With Quote
  #3  
Old 2/3/07, 2:40 PM
Marc D. Shunk's Avatar
Marc D. Shunk Marc D. Shunk is offline
Banned
 
Join Date: Dec 2006
Location: Central PA
Posts: 1,980
Please Note: Marc D. Shunk is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Meter question

Schedule 40 PVC is okay for the portion buried in the bottom of the trench. The portion from the sweep to the meter is generally considered to be exposed to physical damage. Schedule 80 PVC is the only nonmetallic conduit rated for protection against physical damage. The sweep may even be required to be of sch 80, if it is of a sufficiently long radius that it might be near the surface. Most jurisdictions and/or utilities would have required schedule 80, if a nonmetallic raceway is chosen, for the raceway section pictured.
Reply With Quote
  #4  
Old 2/3/07, 2:51 PM
Paul W. Abernathy Paul W. Abernathy is offline
InterNACHI Member
 
Join Date: Sep 2005
Location: Spotsylvania, VA
Posts: 8,072
Send a message via AIM to pabernathy Send a message via MSN to pabernathy Send a message via Skype™ to pabernathy
Default Re: Meter question

Really depends on the judgment of the AHJ, Sch.80 did not make it as a method of physical protection on the riser list until the 2002 NEC even if refered to in the section below. This inspection was done in 1997 and chances are the AHJ made the judgment call.

However as MARC stated it was given as a method in the 1999 under 300-5(d)

The problem with some AHJ's is in the determination of "Physical Damage" as it says "Where enclosures or raceways is subject to physical damage........lets say in an area where it would be very hard to assume physical damage..are we always supposed assume it.

Anyway....as I stated in todays environement yes SCH.80 but I would not let that be a report flag issue



Paul W. Abernathy

Last edited by pabernathy; 2/3/07 at 2:57 PM..
Reply With Quote
  #5  
Old 2/3/07, 3:02 PM
Paul W. Abernathy Paul W. Abernathy is offline
InterNACHI Member
 
Join Date: Sep 2005
Location: Spotsylvania, VA
Posts: 8,072
Send a message via AIM to pabernathy Send a message via MSN to pabernathy Send a message via Skype™ to pabernathy
Default Re: Meter question

Man I left the 1999 CODE so long ago, the inspection was done in 1997 and chances are you were still under that 1996 NEC code( and I dont have one handy..sorry )....and someone saw Section 230-50 (a)(3) where it says " Rigid nonmetallic conduit suitable for the location " and then the got confused....



Paul W. Abernathy

Last edited by pabernathy; 2/3/07 at 3:07 PM..
Reply With Quote
  #6  
Old 2/3/07, 4:34 PM
ccbrands1 ccbrands1 is offline
Active Poster
 
Join Date: Jan 2006
Posts: 220
Please Note: ccbrands1 is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Meter question

many thanks to you both, Paul and Marc.
Reply With Quote
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
City electrical inspector says move the meter and panel cbottger Electrical Inspections 9 4/4/07 8:59 PM
Another Service Entrance Amps Question pdickerson Electrical Inspections 2 8/7/06 3:39 PM
Electrical Inspection with Temp. Service? dandersen Electrical Inspections 16 6/27/06 10:41 PM
Meter Question cbarrows Electrical Inspections 5 6/26/06 9:22 PM


All times are GMT -4. The time now is 7:43 AM.


Popular Sections

:

All Sections

Inspection News

InterNACHI Membership

Inspection Standards

Inspection Education

InterNACHI Inspectors

Inspection Links

 

 

 

NACHI.ORG Statistics

 

 

no new posts