InterNACHI


Go Back   InterNACHI Inspection Forum > Specific Inspection Topics > Electrical Inspections

Notices

Electrical Inspections Contains discussions about electrical systems. This includes receptacles, panels, wiring, etc.

 
Reply
 
LinkBack Thread Tools
  #16  
Old 3/7/06, 9:35 PM
Joseph Hagarty,  CMI's Avatar
Joseph Hagarty, CMI Joseph Hagarty,  CMI is offline
InterNACHI Member
 
Join Date: Jan 2003
Location: Parkesburg, PA
Posts: 5,636
Default Re: No main disconnect

Quote:
Originally Posted by rcooke

I am a retired sparky and do not get into code.... period.
.
............ my call would be!

Main panel (Immediate Further evaluation by qualified person.)
I think there is too many concerns to start and list them all.
It is wrong and must be fixed .

Roy Cooke . Royshomeinspection.com.....
Why???



Joseph P. Hagarty
joseph.hagarty@comcast.net
Main Line Inspections, Inc.
Phone: 610-399-3675
Email: MainLineHI@comcast.net

http://pa.nachi.org/mainlinepa/about.html
http://www.householdinspector.com

National President / NACHI (2003-2004)
NACHI Education Committee Member
Reply With Quote
  #17  
Old 3/7/06, 9:39 PM
rwand1 rwand1 is offline
Active Poster
 
Join Date: Sep 2005
Location: Caledon, ON
Posts: 7,861
Please Note: rwand1 is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: No main disconnect

Personally I don't understand the theory behind six throws or eight throws. The better method is to have a main shut-off.

I would have no hesitation whatsoever in advising my client to upgrade this panel.
Reply With Quote
  #18  
Old 3/7/06, 9:45 PM
Roy D. Cooke, Sr's Avatar
Roy D. Cooke, Sr Roy D. Cooke, Sr is offline
InterNACHI Member
 
Join Date: Aug 2003
Location: Brighton, ON
Posts: 14,612
Default Re: No main disconnect

Quote:
Originally Posted by jhagarty
Why???
Too many trades to many codes and what purpose does it serve it is wrong and needs to be fixed .
CRA.. Just one more way of avoiding a problem in court .
. (If the lawyer says to me why did you quote code on the stairs and not the furnace ).
I do not know all the codes and do not need to know all so I use none . Works for me and many other Inspectors I know.
Roy Cooke . Royshomeinspection.com


CRA.... Cover Roy's ***** . CRA I think saves me many $$$$$$.
Write Hard talk soft and miss nothing.
Reply With Quote
  #19  
Old 3/7/06, 9:48 PM
Joseph Hagarty,  CMI's Avatar
Joseph Hagarty, CMI Joseph Hagarty,  CMI is offline
InterNACHI Member
 
Join Date: Jan 2003
Location: Parkesburg, PA
Posts: 5,636
Default Re: No main disconnect

Roy:

Are Canadian Standards different than USA?

6 throws to disconnect power are acceptable.

Split Main Panels are widely in use in this area and are acceptable per Electrical Code (barring any other deficiency).

What is the justification of a recommendation for replacement of a Split Main Panel?



Joseph P. Hagarty
joseph.hagarty@comcast.net
Main Line Inspections, Inc.
Phone: 610-399-3675
Email: MainLineHI@comcast.net

http://pa.nachi.org/mainlinepa/about.html
http://www.householdinspector.com

National President / NACHI (2003-2004)
NACHI Education Committee Member
Reply With Quote
  #20  
Old 3/7/06, 9:59 PM
Roy D. Cooke, Sr's Avatar
Roy D. Cooke, Sr Roy D. Cooke, Sr is offline
InterNACHI Member
 
Join Date: Aug 2003
Location: Brighton, ON
Posts: 14,612
Default Re: No main disconnect

Quote:
Originally Posted by jhagarty
Roy:

Are Canadian Standards different than USA?

6 throws to disconnect power are acceptable.

Split Main Panels are widely in use in this area and are acceptable per Electrical Code (barring any other deficiency).

What is the justification of a recommendation for replacement of a Split Main Panel?
Yes many differences example neutral and grounds are never mixed . You can not go to a sub panel with three wire ( two hots and a neutral ) You must carry a ground. you can not have a second ground system at the out building . ( leads to strange Eddie currents)You need a main disconnect for the panel It can be a back fed breaker.
Our code is the same across Canada. .
I see you have different things from one area to another in the USA

Roy Cooke Royshomeinspection.com
Reply With Quote
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Main disconnect at meter instead of main panel. OK? kshepard Electrical Inspections 14 11/8/06 6:24 PM
Tenant access to main disconnect in apartment bldg? lhoffman Electrical Inspections 4 9/1/06 11:54 AM
No main disconnect? mboyett Electrical Inspections 25 8/6/06 11:53 PM
Disconnect and Main panel srowe Electrical Inspections 10 6/13/06 7:49 PM
Main Disconnect Manufactured Home dbreen Electrical Inspections 1 3/4/06 12:42 PM


All times are GMT -4. The time now is 3:52 AM.


Popular Sections

:

All Sections

Inspection News

InterNACHI Membership

Inspection Standards

Inspection Education

InterNACHI Inspectors

Inspection Links

 

 

 

NACHI.ORG Statistics

 

 

no new posts