InterNACHI


Go Back   InterNACHI Inspection Forum > Specific Inspection Topics > Electrical Inspections

Notices

Electrical Inspections Contains discussions about electrical systems. This includes receptacles, panels, wiring, etc.

 
Reply
 
LinkBack Thread Tools
  #1  
Old 2/13/06, 9:22 PM
jweinberg's Avatar
jweinberg jweinberg is offline
Active Poster
 
Join Date: Feb 2005
Location: San Jose, CA
Posts: 420
Please Note: jweinberg is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Proper?

Old Fuse box taken out of metal box....new Square D Main Panel installed beside it.

Have used the abandoned old fuse box to make multiple (11) connections between new, short copper distribution wiring to the existing old Knob and Tube. These connections are made inside the old Fuse Box with a swing door.

Are wire nuts and the metal fuse box with an accesible door sufficient? Or should these connections be done inside a closed, inaccesible junction box?

Thanks....

Jeff
Attached Thumbnails
proper-img_7621.jpg   proper-img_7626_r1.jpg  
Reply With Quote
  #2  
Old 2/13/06, 10:05 PM
Jeffrey R. Pope's Avatar
Jeffrey R. Pope Jeffrey R. Pope is offline
InterNACHI Member
 
Join Date: Aug 2003
Location: Santa Clarita, CA
Posts: 8,057
Default Re: Proper?

Splices/wire-nuts are okay in the j-box with a door.

Pretty common setup for a service upgrade.



IF YOUR INSPECTOR IS NOT USING THERMAL IMAGING, YOU'RE NOT GETTING THE WHOLE PICTURE ®
Jeff Pope
JPI Home Inspection Service
Santa Clarita CA
(661) 212-0738
Santa Clarita Home Inspection
http://www.MyInspector.net


Reply With Quote
  #3  
Old 2/13/06, 10:08 PM
brian winkle brian winkle is offline
Active Poster
 
Join Date: Sep 2005
Location: Arizona
Posts: 454
Please Note: brian winkle is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Proper?

We do it all the time, but the inspector requests we drill and tap to screw the door shut with machine screws NOT pointed sheet metal screws which are forbidden on any enclosure. I also write "No fuses or breakers inside" altho I don't think that is a requirement. the box MUST be bonded whether it be by pipe or grounding wire. Also, the bonding must be through machine threaded screws. Self tapping screws and mounting screws are not allowed for bonding.

Last edited by brian winkle; 2/13/06 at 10:12 PM..
Reply With Quote
  #4  
Old 2/13/06, 10:15 PM
brian winkle brian winkle is offline
Active Poster
 
Join Date: Sep 2005
Location: Arizona
Posts: 454
Please Note: brian winkle is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Proper?

Do they lock all the meters in San Jose like that? Or just when there is a history of non payment?
Reply With Quote
  #5  
Old 2/13/06, 10:55 PM
jweinberg's Avatar
jweinberg jweinberg is offline
Active Poster
 
Join Date: Feb 2005
Location: San Jose, CA
Posts: 420
Please Note: jweinberg is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Proper?

Thanks Jeff...
Reply With Quote
  #6  
Old 2/13/06, 11:21 PM
Jeffrey R. Pope's Avatar
Jeffrey R. Pope Jeffrey R. Pope is offline
InterNACHI Member
 
Join Date: Aug 2003
Location: Santa Clarita, CA
Posts: 8,057
Default Re: Proper?

Quote:
Originally Posted by brian winkle
Do they lock all the meters in San Jose like that? Or just when there is a history of non payment?
I don't think I've ever seen a meter without a lock.



IF YOUR INSPECTOR IS NOT USING THERMAL IMAGING, YOU'RE NOT GETTING THE WHOLE PICTURE ®
Jeff Pope
JPI Home Inspection Service
Santa Clarita CA
(661) 212-0738
Santa Clarita Home Inspection
http://www.MyInspector.net


Reply With Quote
  #7  
Old 2/14/06, 12:44 AM
jweinberg's Avatar
jweinberg jweinberg is offline
Active Poster
 
Join Date: Feb 2005
Location: San Jose, CA
Posts: 420
Please Note: jweinberg is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Proper?

Quote:
Originally Posted by jpope
I don't think I've ever seen a meter without a lock.
Me too. You just can't trust us Californians......
Reply With Quote
  #8  
Old 2/14/06, 2:49 AM
Russel Ray's Avatar
Russel Ray Russel Ray is offline
InterNACHI Member
 
Join Date: Mar 2003
Location: La Mesa, CA
Posts: 16,629
Default Re: Proper?

The utility company uses similar locks here and in Texas where I grew up.
Reply With Quote
  #9  
Old 2/15/06, 1:05 PM
ewbarker ewbarker is offline
New User
 
Join Date: Feb 2006
Location: Barrington, IL
Posts: 7
Please Note: ewbarker is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Proper?

No comment on Knob & tube?
Reply With Quote
  #10  
Old 2/15/06, 1:21 PM
Russel Ray's Avatar
Russel Ray Russel Ray is offline
InterNACHI Member
 
Join Date: Mar 2003
Location: La Mesa, CA
Posts: 16,629
Default Re: Proper?

Quote:
Originally Posted by ewbarker
No comment on Knob & tube?
Here's an article from About Homes:

INF-0060 from Electricity
Reply With Quote
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
PVC waste lines lagudo Plumbing Inspections 10 3/6/11 1:57 AM
Electricians Check List pabernathy Electrical Inspections 74 12/5/07 6:39 PM
What is the proper name of this "monster"? yolhovsky Ancillary Inspection Services & Additional Topics 34 11/15/07 1:35 PM
Proper Complaint Procedures rcooke Canadian Inspectors 0 8/15/06 10:35 AM
Are these proper connections? jweinberg Plumbing Inspections 9 5/25/06 8:32 PM


All times are GMT -4. The time now is 9:22 AM.


Popular Sections

:

All Sections

Inspection News

InterNACHI Membership

Inspection Standards

Inspection Education

InterNACHI Inspectors

Inspection Links

 

 

 

NACHI.ORG Statistics

 

 

no new posts