InterNACHI


Go Back   InterNACHI Inspection Forum > Specific Inspection Topics > Electrical Inspections

Notices

Electrical Inspections Contains discussions about electrical systems. This includes receptacles, panels, wiring, etc.

 
Reply
 
LinkBack Thread Tools
  #1  
Old 5/22/08, 3:45 PM
Walter J. Olejarski Walter J. Olejarski is offline
New User
 
Join Date: Apr 2008
Location: West Melbourne, Fl
Posts: 2
Please Note: wolejarski is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Service Panel ground bonding

not in NEC and my electrician friend could not answer. Block wall, meter and service panel back to back connected with steel threaded pipe. The steel threaded pipe is the only means of bond between the two. Meter box grounded to electrode outside.
Is the steel pipe an acceptable bond for ground?

Walter
Reply With Quote
  #2  
Old 5/22/08, 4:31 PM
Speedy Petey Speedy Petey is offline
Unmoderated Guest
 
Join Date: Jul 2006
Posts: 1,297
Please Note: Speedy Petey is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Service Panel ground bonding

You need a bonding lock nut if the nipple is in the largest knockout. Or a bonding busing and jumper if it is in a concentric knockout.

A PVC nipple is MUCH easier in this case. NO bonding is necessary.
Reply With Quote
  #3  
Old 5/23/08, 12:13 AM
Greg Fretwell Greg Fretwell is offline
Active Poster
 
Join Date: Jul 2004
Location: Estero Florida
Posts: 1,798
Please Note: Greg Fretwell is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Service Panel ground bonding

A PVC nipple also eliminates the "parallel neutral" problem caused when you have a bonding jumper in the service disconnect enclosure and the PoCo bonds the neutral in the meter base. They changed the code (2002?) to make this legal but it is still troubling to people who take 250.6 seriously.
All metalic raceways carrying service conductors need bonding connectors like Speedy says.
Reply With Quote
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Neutral bus bar failed inspection Greg Moritz Electrical Inspections 18 1/19/08 1:53 PM
Ground connections at panel & exterior dmacy Electrical Inspections 4 1/4/08 12:27 AM
Ground Wires Inside a Panel mveitenhans Electrical Inspections 13 10/29/06 11:39 AM
Bad electrical problem Pest Guy Electrical Inspections 4 1/20/06 9:26 PM


All times are GMT -4. The time now is 8:26 AM.


Popular Sections

:

All Sections

Inspection News

InterNACHI Membership

Inspection Standards

Inspection Education

InterNACHI Inspectors

Inspection Links

 

 

 

NACHI.ORG Statistics

 

 

no new posts