InterNACHI


Go Back   InterNACHI Inspection Forum > Specific Inspection Topics > Electrical Inspections

Notices

Electrical Inspections Contains discussions about electrical systems. This includes receptacles, panels, wiring, etc.

 
Reply
 
LinkBack Thread Tools
  #1  
Old 3/3/07, 7:24 PM
David C. Macy's Avatar
David C. Macy David C. Macy is online now
InterNACHI Member
 
Join Date: Jan 2004
Location: NE. OH
Posts: 2,658
Default Spliced SEC, FPE & Bonding

The main SEC were spliced in the FPE panel. It looks like they ran copper to the older cloth SEC that I believe would be Tin coated copper.

It is not allowed to splice the SEC correct?

Also the Sub panel looked to be improperly bonded as I have asked about many times & I hope I understand. If I am correct the bonding bar should not be installed in the sub.

Thanks
Attached Thumbnails
spliced-sec-fpe-and-bonding-92407-047-small-.jpg.jpg
Views:	73
Size:	64.2 KB
ID:	9677   spliced-sec-fpe-and-bonding-92407-042-small-.jpg.jpg
Views:	74
Size:	56.2 KB
ID:	9678   spliced-sec-fpe-and-bonding-92407-040-small-.jpg.jpg
Views:	63
Size:	53.6 KB
ID:	9679  

Last edited by dmacy; 3/3/07 at 8:07 PM..
Reply With Quote
  #2  
Old 3/3/07, 8:58 PM
Jeffrey R. Pope's Avatar
Jeffrey R. Pope Jeffrey R. Pope is offline
InterNACHI Member
 
Join Date: Aug 2003
Location: Santa Clarita, CA
Posts: 8,057
Default Re: Spliced SEC, FPE & Bonding

Splicing the SEC is allowed. I can't tell how it was done in your picture.

The load side panel is improperly wired. The egc's are attached to the neutral bus and there is no grounding bus.

The tie-bar could be removed and one bus could be bonded to the box, but that's not for us to decide.



IF YOUR INSPECTOR IS NOT USING THERMAL IMAGING, YOU'RE NOT GETTING THE WHOLE PICTURE ®
Jeff Pope
JPI Home Inspection Service
Santa Clarita CA
(661) 212-0738
Santa Clarita Home Inspection
http://www.MyInspector.net


Reply With Quote
  #3  
Old 3/3/07, 9:19 PM
Marc D. Shunk's Avatar
Marc D. Shunk Marc D. Shunk is offline
Banned
 
Join Date: Dec 2006
Location: Central PA
Posts: 1,980
Please Note: Marc D. Shunk is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Spliced SEC, FPE & Bonding

It also lookes like the service entrance nipple is not connected to the service panel. It appears that they took out enough knockouts to just place the panel over the nipple sticking through the wall. Other than that problem, the panel on the left looks reasonably well done (or as good as a 12" wide FPE can look). Probalby a few doubled up neutrals in there too, judging purely by the number of branch breakers versus how many screws I believe that panel has on the neutral bar. The panel on the right has the obvious problems that Mr. Pope points out. The panel on the right also has serious workmanship issues.
Reply With Quote
  #4  
Old 3/3/07, 9:27 PM
Marc D. Shunk's Avatar
Marc D. Shunk Marc D. Shunk is offline
Banned
 
Join Date: Dec 2006
Location: Central PA
Posts: 1,980
Please Note: Marc D. Shunk is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Spliced SEC, FPE & Bonding

Quote:
Originally Posted by jpope
Splicing the SEC is allowed. I can't tell how it was done in your picture.
I've been puzzling on that picture, trying to determine for myself how that splice might have been accomplished. I noticed that the grounding electrode conductor to the left of the panel was spliced with a copper C-Tap. The black taped up profile of the spliced service entrance conductors in the panel is pretty much what you'd expect from a completed H-tap or C-tap crimp, which is accomplished with the same general tooling. In any event, it appears compliant and well done, from what I can see in the pictures.
Reply With Quote
  #5  
Old 3/3/07, 10:26 PM
tdietrich1's Avatar
tdietrich1 tdietrich1 is offline
InterNACHI Member
 
Join Date: Oct 2006
Location: Northampton County - Pa
Posts: 1,954
Send a message via Yahoo to tdietrich1
Default Re: Spliced SEC, FPE & Bonding

That looks like a GE manufactured panel, I had a run in with an electrical inspector, removing the tie bar is only allowed if you creating an 'isolated grounding bar'. A ground bar must be purchased/installed for separating grounds from neutrals.

tom
Reply With Quote
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Bonding Piping 101....Good To Know ! pabernathy Electrical Inspections 37 4/28/07 11:25 AM
What Is Bonding...... pabernathy Electrical Inspections 46 1/1/07 1:17 PM
Bonding dmacy Electrical Inspections 20 12/29/06 10:43 AM
Demystify Grounding & Bonding Class pabernathy Inspection Education & Training 5 12/24/06 1:10 AM


All times are GMT -4. The time now is 8:33 AM.


Popular Sections

:

All Sections

Inspection News

InterNACHI Membership

Inspection Standards

Inspection Education

InterNACHI Inspectors

Inspection Links

 

 

 

NACHI.ORG Statistics

 

 

no new posts