I was doing a reverse ride along with a new inspector. Condo conversion in a courtyard style building, built in 1928. Mostly, a real good conversion.

They totally redid the electric, with big 600 amp disconnects in the basement and multiple meter panels. Six service drops in all (for each of the six "sections" of the building. 6 units per drop with 100 amp service to each unit (one and two bedroom units).

BUT.

This is the drop. Six (each) of the two hot legs and neutral (Excuse me, Paul. Grounded Conductors.). Each service had its own rigid pipe service entrance, take to the 6 parts of the building (into six different basement electrical rooms. BTW: The owners thought that the electrical rooms were great places to store their bikes. What a freakin' mess!

Each incoming SE was at least a 6/0 (Maybe 8/0. They were most probably the width of my thumb. Please remember, this was a three year old conversion, NOT a temporary hookup.

But look at what the ComEd guys used for the drop. It couldn't have been bigger than 2/0 or 3/0.

Comments?
Attached Thumbnails
thgose-darn-pocos-drop_small-big_small.jpg  



Will Decker, CMI
ILL License # 450.0002240
Board Certified Master Inspector
Decker Home Services, LLC
Chicago and Northern Suburban Home Inspections
Office: (847) 676-8393
Cell: (847) 609-2345
Home: (847) 673-2702

wjd@DeckerHomeServices.com
www.DeckerHomeServices.com

Learn, Educate, Serve and have fun doing it!
Reply With Quote
  #2  
Old 4/12/07, 8:02 PM
Larry D. Kage Larry D. Kage is offline
InterNACHI Member
 
Join Date: Jul 2004
Location: Lake Ann (Traverse City), MI
Posts: 8,848
Default Re: Thgose Darn PoCo's

Gotta admit, it does look funny.

The fine print requires that no two owners use their toasters at the same time.



InterNachi Awards Portal: http://co.nachi.org/inachiawards/

____________________________________________
"An Education, not just an Inspection"

Larry Kage, CMI
Lake Ann (Traverse City), Michigan 49650
231 929 3525


Professional Inspector serving the Traverse City, Michigan area and beyond.
Reply With Quote
  #3  
Old 4/12/07, 8:25 PM
Marc D. Shunk's Avatar
Marc D. Shunk Marc D. Shunk is offline
Banned
 
Join Date: Dec 2006
Location: Central PA
Posts: 1,980
Please Note: Marc D. Shunk is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Thgose Darn PoCo's

The POCO sizes their conductors to a completely different set of rules. They use the NESC. A 3/0 would be good for 500-odd amps by their rules.
Reply With Quote
  #4  
Old 4/12/07, 8:35 PM
William J. Decker's Avatar
William J. Decker William J. Decker is offline
InterNACHI Member
 
Join Date: Nov 2004
Location: Skokie, IL
Posts: 7,785
Default Re: Thgose Darn PoCo's

Quote:
Originally Posted by Marc D. Shunk
The POCO sizes their conductors to a completely different set of rules. They use the NESC. A 3/0 would be good for 500-odd amps by their rules.
But one 3/0 (at best) to SIX different SEs of 600 amps each?

So, there are 6 individual drops (six different services to six different 600 amp main disconnects, each serving six different meters with their own 100 amp meter disconnects).

And they are connected to the PoCo by one 3/0 conductor.

Of course it is 'legal' (PoCos are their own 'de facto' AHJs), but is it correct?

Want to place a wager on how many times this setup faults?

If so, call me. I will bet $100.00 that it blows at least once in the next year.

(Remember, this is Chicago.)



Will Decker, CMI
ILL License # 450.0002240
Board Certified Master Inspector
Decker Home Services, LLC
Chicago and Northern Suburban Home Inspections
Office: (847) 676-8393
Cell: (847) 609-2345
Home: (847) 673-2702

wjd@DeckerHomeServices.com
www.DeckerHomeServices.com

Learn, Educate, Serve and have fun doing it!
Reply With Quote
  #5  
Old 4/12/07, 9:08 PM
rromoser's Avatar
rromoser rromoser is offline
InterNACHI Member
 
Join Date: Oct 2006
Location: Fishers, IN
Posts: 187
Default Re: Thgose Darn PoCo's

Birds can warm their feet in January by perching on them.
Free air increases the ampacity of a conductor greatly.
Reply With Quote
  #6  
Old 4/12/07, 9:59 PM
brian winkle brian winkle is offline
Active Poster
 
Join Date: Sep 2005
Location: Arizona
Posts: 454
Please Note: brian winkle is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Thgose Darn PoCo's

Like the others said, it might be ok. However, there is also a chance that the final inspection never occured, or the clearance was never forwarded to the POCO, or they just lost it. Ocasionally I will run into a service that was obviously done several years ago, but will not be spliced in with POCO splices.

In most cities it is possible to get away with NEVER calling in for your final, it will just get swallowed up down at planning & zoning and no one will ever check up on it.

If you feel this might have happened, you could go to your building dept and look it up to see if the final electrical was ever done.
Reply With Quote
  #7  
Old 4/12/07, 10:35 PM
William J. Decker's Avatar
William J. Decker William J. Decker is offline
InterNACHI Member
 
Join Date: Nov 2004
Location: Skokie, IL
Posts: 7,785
Default Re: Thgose Darn PoCo's

Quote:
Originally Posted by brian winkle
Like the others said, it might be ok. However, there is also a chance that the final inspection never occured, or the clearance was never forwarded to the POCO, or they just lost it. Ocasionally I will run into a service that was obviously done several years ago, but will not be spliced in with POCO splices.

In most cities it is possible to get away with NEVER calling in for your final, it will just get swallowed up down at planning & zoning and no one will ever check up on it.

If you feel this might have happened, you could go to your building dept and look it up to see if the final electrical was ever done.
What does that say about the 'government' inspectors (those who deride us) who are paid by the public to protect the public?



Will Decker, CMI
ILL License # 450.0002240
Board Certified Master Inspector
Decker Home Services, LLC
Chicago and Northern Suburban Home Inspections
Office: (847) 676-8393
Cell: (847) 609-2345
Home: (847) 673-2702

wjd@DeckerHomeServices.com
www.DeckerHomeServices.com

Learn, Educate, Serve and have fun doing it!
Reply With Quote
  #8  
Old 4/12/07, 11:41 PM
brian winkle brian winkle is offline
Active Poster
 
Join Date: Sep 2005
Location: Arizona
Posts: 454
Please Note: brian winkle is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Thgose Darn PoCo's

Quote:
Originally Posted by wdecker
What does that say about the 'government' inspectors (those who deride us) who are paid by the public to protect the public?
To me it says they are understaffed and overloaded, just like the police.
Reply With Quote
  #9  
Old 4/13/07, 2:33 AM
Greg Fretwell Greg Fretwell is offline
Active Poster
 
Join Date: Jul 2004
Location: Estero Florida
Posts: 1,798
Please Note: Greg Fretwell is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Thgose Darn PoCo's

I have done plenty of service inspections and I have never called the PoCo. The EC, GC or the owner does that. All they needed from me was a copy of the inspection report. I have had to fax a copy to the GC when they lost the one I left tho.
Reply With Quote
  #10  
Old 4/13/07, 9:46 AM
brian winkle brian winkle is offline
Active Poster
 
Join Date: Sep 2005
Location: Arizona
Posts: 454
Please Note: brian winkle is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default Re: Thgose Darn PoCo's

Yes Greg thats another chance for it to slip thru the cracks. It's the same here, the POCO most receive clearance from the city or county, and they also must receive an "application" by telephone from the owner or the contractor. Any one of these things gets missed and the service could be temped in forever.
Reply With Quote
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Those darn Adjustable Rate Mortgages dduffy Miscellaneous Discussion for Inspectors 8 6/20/06 6:56 AM


All times are GMT -4. The time now is 8:45 AM.


Popular Sections

:

All Sections

Inspection News

InterNACHI Membership

Inspection Standards

Inspection Education

InterNACHI Inspectors

Inspection Links

 

 

 

NACHI.ORG Statistics

 

 

no new posts