InterNACHI


Go Back   InterNACHI Inspection Forum > Specific Inspection Topics > Electrical Inspections

Notices

Electrical Inspections Contains discussions about electrical systems. This includes receptacles, panels, wiring, etc.

Reply
 
LinkBack Thread Tools
  #1  
Old 6/12/09, 11:45 PM
Al D. Bolt Al D. Bolt is offline
InterNACHI Member
 
Join Date: Dec 2006
Location: Twin Falls, ID
Posts: 93
Default Ufer

Is this paper between the ground wire and the ufer grounding rod something to call?
Attached Thumbnails
ufer-img_8546-small-.jpg.JPG
Views:	96
Size:	41.9 KB
ID:	29240  
Reply With Quote
Find an InterNACHI certified Arizona Home Inspector (and anywhere else in North America)
  #2  
Old 6/13/09, 12:05 AM
Jeffrey R. Wicklander's Avatar
Jeffrey R. Wicklander Jeffrey R. Wicklander is offline
InterNACHI Member
 
Join Date: Mar 2008
Location: Lake Forest, Il
Posts: 1,115
Default Re: Ufer

The bolt, when cranked on, should have driven itself hard against the rebar and separated the paper enough to make a decent contact. As a backup, there should be the other GEC's used.

Jeff



Jeff Wicklander
Corwick Home Services

Join my business on Facebook
Reply With Quote
  #3  
Old 6/13/09, 11:56 AM
Paul W. Abernathy's Avatar
Paul W. Abernathy Paul W. Abernathy is offline
InterNACHI Member
 
Join Date: Sep 2005
Location: Spotsylvania, VA
Posts: 8,047
Send a message via AIM to pabernathy Send a message via MSN to pabernathy Send a message via Skype™ to pabernathy
Default Re: Ufer

I would call it out......my problem with is I dont know if they torqued it right. I see a GEC laying on paper and with it's smooth surface I want as much contact as possible in the case of a lighting strike or surge onto the system from a high power line.

If it was me I would lighten it up, scrape off the paper and re-torque with full contact. To me this is jack leggish.

Now to address Jeff's statement......their MIGHT not be other GEC's used because if you use a UFER you dont need another electrode....so lets make the ONE they must use right and give it a chance to do it's job properly.

Here is a case where if I have a wrench with me even as an HI I would lighten it up, drop it down if I can or remove the paper to have full contact and I would let the client see that I care about the connection.......if that is the only problem but if their are other issues...just let the electrician correct it.

The set screw is to secure it, lets not lessen the need for the GEC's contact to the rebar as well in the overall picture.





Paul W. Abernathy,CMI,CPI,CME
National Electrical Code Expert
Electrical & Fire Protection Systems Code Supervisor- Alexandria,VA
Weekly Live Radio Show :http://en.1000mikes.com/show/the_electrical_guru
Weekly Chat on Wednesdays -7:30 PM E.S.T
* Get my 13 hour commentary audio CD for the book "How to Perform Electrical Inspections"

2007 InterNACHI Member of the Year
Reply With Quote
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
UFER tail mnicholet Electrical Inspections 6 6/27/08 10:04 PM
What's this video worth? jtedesco1 Inspection Education & Training 5 4/18/08 10:24 AM
Re-Bar Ground Rod jevans Electrical Inspections 23 12/3/07 1:11 PM
New construction questions dmacy Electrical Inspections 8 12/5/06 5:19 PM


All times are GMT -4. The time now is 2:54 PM.


Popular Sections

:

All Sections

Inspection News

InterNACHI Membership

Inspection Standards

Inspection Education

InterNACHI Inspectors

Inspection Links

 

 

 

NACHI.ORG Statistics

 

 

no new posts