The home I inspected today had an updated rectangular meter installed.
The main panel was 100 amps.

It appeared to me that the wires from the weather head to the top of the meter were not updated. (See photo)

I also thought the connection to the main service wires was inadequate.

Also in the main panel it appeared to have 14 gauge romex to 20 amp breakers. The romex ran along the basement but there where no markings on the sheathing. (See photos)

Am I wrong in saying that the service may only be 60 amps because of the service wires at the weather head.

I called out a sparky for the weather head & undersized wires.

Do you see anything else that I may have missed?

Dave

Last edited by dmacy; 11/6/07 at 7:12 PM..
Reply With Quote
  #2  
Old 2/7/06, 7:30 PM
Paul W. Abernathy Paul W. Abernathy is offline
InterNACHI Member
 
Join Date: Sep 2005
Location: Spotsylvania, VA
Posts: 8,072
Send a message via AIM to pabernathy Send a message via MSN to pabernathy Send a message via Skype™ to pabernathy
Default Re: Weather head

Well I can't tell from the pictures but you did the correct thing...have an Electrical Contractor look at it...

While many will argue that the line side can be smaller as it pertains to the UTY....if the electrician installs the mast and weatherhead it better be sized correctly.

If the old wires are # 4 AWG CU then they are fine for 100A....now thats guessing on the insulation jacket and what not....

In may be that the electrician who upgraded the system re-used the mast and simply placed a new weatherhead on it....anyway I would hope that the municiple inspector signed off on it before the meter was placed back in the CAB......sad to hear in some areas the things are not inspected at all so who knows....

The only real way to tell is either by pulling the meter ...or getting up and looking and the size conductors at the weatherhead.....sad however that a contractor will go through all the issues of updating a system and not replace the mast and conductors within it.....to me just a cheap job...I mean heck look at the panel wires.....does it take an effort to make things NEAT anymore....young electricians today...what are you gonna do with um...

Now we will assume the wiring from the meter cab to the updated panel ( still sloppy..but updated ) is new wire because it looks like it may be.....



Paul W. Abernathy
Reply With Quote
  #3  
Old 2/7/06, 7:43 PM
Robert J. OConnor's Avatar
Robert J. OConnor Robert J. OConnor is offline
InterNACHI Member
 
Join Date: Jul 2003
Location: Long Island, NY
Posts: 1,288
Default Re: Weather head

For a 100A service there should be #4 Cu (about 3/16" bare) or #2 Al (about 1/4" bare) service feeder wires, which should be visible at the main breaker ... and the wire to the 20A breaker looks a little larger than the wire to the 15A breaker above in photo #2. Plastic wire gages can also help in that situation (pretty cheap, and good to have).

JMO & 2-nickels ...



Robert O'Connor, PE
Consulting Engineer & Inspector
LIU CW Post Adjunct Professor
NACHI Education Committee
www.reporthost.com/-rjo

I am absolutely amazed sometimes by how much thought goes into doing things wrong ...

Last edited by roconnor; 2/7/06 at 8:13 PM..
Reply With Quote
  #4  
Old 2/8/06, 7:19 AM
David P. Valley's Avatar
David P. Valley David P. Valley is offline
InterNACHI Member
 
Join Date: Jun 2003
Location: METHUEN, MA
Posts: 8,681
Default Re: Weather head

From the looks of the pics, I see a 100 Amp service.
Reply With Quote
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
House Wrap brepanshek Exterior Inspections 26 10/4/08 9:45 PM
Low water usage shower head - squirts lfoster Plumbing Inspections 4 6/2/07 12:40 PM
Vinyl siding installation guide badair Exterior Inspections 18 3/27/07 5:38 PM
Head Start Packet jmckenna1 Miscellaneous Discussion for Inspectors 18 11/15/06 1:24 AM


All times are GMT -4. The time now is 5:06 AM.


Popular Sections

:

All Sections

Inspection News

InterNACHI Membership

Inspection Standards

Inspection Education

InterNACHI Inspectors

Inspection Links

 

 

 

NACHI.ORG Statistics

 

 

no new posts