InterNACHI


Go Back   InterNACHI Inspection Forum > Specific Inspection Topics > Inspecting HVAC Systems

Notices

Inspecting HVAC Systems Topics include heating, venting, and air conditioning inspections.

 
Reply
 
LinkBack Thread Tools
  #1  
Old 3/1/09, 12:04 PM
rmaday's Avatar
rmaday rmaday is offline
Active Poster
 
Join Date: Jan 2008
Location: Itasca, IL
Posts: 5,197
Please Note: rmaday is a non-member guest and is in no way affiliated with InterNACHI or its members.
Default How would you write this

nevermind
Reply With Quote
  #2  
Old 3/1/09, 3:35 PM
Brian E. Kelly's Avatar
Brian E. Kelly Brian E. Kelly is offline
InterNACHI Member
 
Join Date: Oct 2004
Location: Phoenix, AZ
Posts: 15,973
Default Re: How would you write this

The installation of the nevermind device does not meet current industry standards. We recommend that the nevermind device be evaluated by a Licensed, Competent, Nevermind contractor with remedy as necessary.
Reply With Quote
  #3  
Old 3/1/09, 6:38 PM
Michael J. Merino's Avatar
Michael J. Merino Michael J. Merino is offline
InterNACHI Member
 
Join Date: Sep 2008
Location: Oak Forest, IL
Posts: 794
Default Re: How would you write this

Quote:
Originally Posted by bkelly2 View Post
The installation of the nevermind device does not meet current industry standards. We recommend that the nevermind device be evaluated by a Licensed, Competent, Nevermind contractor with remedy as necessary.
Now that is real funny!! . But isn't the never mind device installed on the real estate agent? You know when they say, "never mind that defect, just buy the house."



Michael Merino
Merino's Home Inspection & Education Inc.
"Not just an Inspection, an Education"SM
Phone/Fax 708~535~6057
Reply With Quote
  #4  
Old 3/1/09, 6:53 PM
Bob Elliott's Avatar
Bob Elliott Bob Elliott is online now
InterNACHI Member
 
Join Date: Aug 2006
Location: Chicago
Posts: 21,917
Default Re: How would you write this

I would use a number 2 pencil Rick.
Reply With Quote
  #5  
Old 3/1/09, 6:56 PM
James H. Bushart's Avatar
James H. Bushart James H. Bushart is offline
InterNACHI Member
 
Join Date: Dec 2004
Location: Southwest Missouri
Posts: 20,956
Default Re: How would you write this

I would capitalize the "n" and use a period.



James H. Bushart

Professional Building Analyst, BPI
Missouri, Kansas and Arkansas
314-803-2167
Reply With Quote
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
How do you write up an open neutral mnahrgang Electrical Inspections 7 8/4/08 8:08 PM
Tidbits from the ASHI Message Board jbushart Miscellaneous Discussion for Inspectors 126 4/27/07 11:05 AM
How should I write this gporter Inspecting HVAC Systems 8 6/29/06 3:27 PM


All times are GMT -4. The time now is 12:35 PM.


Popular Sections

:

All Sections

Inspection News

InterNACHI Membership

Inspection Standards

Inspection Education

InterNACHI Inspectors

Inspection Links

 

 

 

NACHI.ORG Statistics

 

 

no new posts