InterNACHI


Go Back   InterNACHI Inspection Forum > Specific Inspection Topics > Ancillary Inspection Services & Additional Topics

Notices

Ancillary Inspection Services & Additional Topics Contains discussions about Radon, Wood Infestation, Water Quality, Well, Septic, Lead, Asbestos, Pool, and Mold inspections.

Reply
 
LinkBack Thread Tools
  #1  
Old 2/9/09, 7:40 PM
Charles Tolbert Charles Tolbert is offline
InterNACHI Member
 
Join Date: Oct 2006
Location: Thomson, GA
Posts: 13
Default Fastening methods for deck pickets

I know that pickets have to be spaced so that 4 inch sphere will not pass between them except that the triangle of the stair case and have to withstand a direct 200 lb force. But what is the code for the fastening method. Local building standard is two ring shank nails at top and bottom of picket and the fasteners should not line up. However, that appears to be the building standard but what is required?? I have a client whose deck is 18 feet in the air with only two nails total per picket.

Thanks
Reply With Quote
  #2  
Old 2/9/09, 8:19 PM
GARY L. RUSK GARY L. RUSK is offline
InterNACHI Member
 
Join Date: Feb 2006
Location: FT. JENNINGS, OH
Posts: 189
Default Re: Fastening methods for deck pickets

Check your email.

Gary
http://www.hsspropertyinspection.com/
Reply With Quote
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT -4. The time now is 3:32 PM.


Popular Sections

:

All Sections

Inspection News

InterNACHI Membership

Inspection Standards

Inspection Education

InterNACHI Inspectors

Inspection Links

 

 

 

NACHI.ORG Statistics

 

 

no new posts