I’ve never seen this plumbing configuration. Supply lines on the left side supply water to the right side. Unfortunately the water was turned off at the time of the inspection but I wonder how adequate the flow would be with both sinks in operation. Any of you seen this before?
1/2’ Copper at 40 p.s.i. and 40 ft. of pipe can supply 12 G.P.M.
Shouldn’t be a problem.
I agree with Mike on this one.