Hi,

I have a question that may sound a little rediculous, however, I need to ask it. In my reporting software there is a section for the "Main Line & Valve Condition" and another for the "Supply Line Condition". My question is if I'm describing issues with the water pump being excessively rusted. Which of these two sections would it technically apply to? Also, there is reference to the the valve condition under the "Main Line & Valve Condition" section. Is this actually referring to a main shut-off valve? If so, that is actually located on the supply line after the bladder tank.


Please advise,

Steve
Reply With Quote
Find an InterNACHI certified Iowa Home Inspector (and anywhere else in North America)
  #2  
Old 6/14/09, 1:39 PM
Jeffrey R. Pope's Avatar
Jeffrey R. Pope Jeffrey R. Pope is offline
InterNACHI Member
 
Join Date: Aug 2003
Location: Santa Clarita, CA
Posts: 7,760
Default Re: Main Line vs. Supply Line Reporting Details

It sounds like you still need to do some work on your software. If it's confusing to you, just imagine how it looks to the client.

The "main line" can be considered everything leading up to the residence. Supply piping is everything within the residence.

You should edit your software and not rely on the "canned" narratives.



IF YOUR INSPECTOR IS NOT USING THERMAL IMAGING, YOU'RE NOT GETTING THE WHOLE PICTURE ®
Jeff Pope
JPI Home Inspection Service
Santa Clarita CA
(661) 212-0738
Santa Clarita Home Inspection
http://www.MyInspector.net


Reply With Quote
  #3  
Old 6/14/09, 4:07 PM
Stephen P. Shockley's Avatar
Stephen P. Shockley Stephen P. Shockley is offline
InterNACHI Member
 
Join Date: May 2009
Location: Salisbury, Maryland
Posts: 213
Default Re: Main Line vs. Supply Line Reporting Details

Actually, I plan on using my own writing for the narratives, even though I've been studying some of the canned narratives that I've pulled off of one of the message boards just to get a feel for the language used in reports. I do a lot of technical writing for my day job as it is. Problem I found was that not only the software that I purchased had subsections like the ones that I mentioned, I found this to be true in several of the programs I sampled. I sort of thought that what you came back with was the case, however, I had to ask the question anyhow. I'm going to adjust my default report.


Regards,

Steve
Reply With Quote
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Steel supply line. sfalvey Plumbing Inspections 4 1/28/11 10:11 AM
Size of supply line aobrien Inspecting HVAC Systems 7 1/2/07 1:40 PM
Gas line & Supply Line thejnicki Plumbing Inspections 2 9/13/06 10:24 AM
PIC of State Rep and sponsor of new NACHI H.I. Bill in NH. gromicko Miscellaneous Discussion for Inspectors 53 8/30/06 6:58 PM
TPRV line and condensate line marriage ccarrington Plumbing Inspections 3 4/29/06 8:59 AM


All times are GMT -4. The time now is 6:15 PM.


Popular Sections

:

All Sections

Inspection News

InterNACHI Membership

Inspection Standards

Inspection Education

InterNACHI Inspectors

Inspection Links

 

 

 

NACHI.ORG Statistics

 

 

no new posts