International Association of Certified Home Inspectors|
#1
|
||||
|
||||
|
Well is it too far?
Last edited by bkelly2; 6/16/08 at 10:47 PM.. |
|
#2
|
||||
|
||||
|
Please Note:
Jay Moge is a non-member guest and is in no way affiliated with InterNACHI or its members.
Brian, is that type "k" or what. i do like the bowing.
|
|
#3
|
||||
|
||||
|
PEX. My guess is it needs supports every 32". I need to get a code book.
|
|
#4
|
||||
|
||||
|
Please Note:
Jay Moge is a non-member guest and is in no way affiliated with InterNACHI or its members.
yeah, let me know if you find a code for that. i'd guess it should at least follow a frame member a be secure every 32'' or so. there is a perfectly good truss there they could have put a strap to and clamped it too.
|
|
#5
|
||||
|
||||
|
I have no idea either, but 32" would be nice...
Do we have any plumbers out there? Jason Sieg, CMI Davison, MI NACHI05091399 Knowing the current condition, to make a wise decision.
President, Great Lakes-East Chapter Join NACHI Great Lakes - East Chapter http://mi.nachi.org/greatlakes-east/about.html ssieg@gfn.org |
|
#6
|
||||
|
||||
|
Please Note:
Jay Moge is a non-member guest and is in no way affiliated with InterNACHI or its members.
"dtdtdtdtdtdt" "dtdtdtdtdtd" "dtdtdtdtdtdt".....(those are cricket sounds)
|
|
#7
|
||||
|
||||
|
I just attended a PEX seminar Thursday evening.
Here's the info you need... For Horizontal runs...Pexcel tubing (the black piping-used for plumbing only) must be fastened at 32" intervals. The FostaPex (the silver coated piping-used for heating and plumbing) must be fastened at 36" - 48" intervals. Both must be fastened utilizing plastic (ONLY) U-clips or clip fasteners. Vertical runs must be fastened at 48" intervals. I was told that plumbers like overusing these clips and installing them at 30" intervals (which is fine) due to the sagging that occurs in between fasteners. |
|
#8
|
||||
|
||||
|
Dave, u da man , thanks
|
|
#9
|
||||
|
||||
|
Quote:
|
|
#10
|
||||
|
||||
|
8 feet???? You've got to be shi++ing me.
And there was no sag in that piping? There had to be. |
|
#11
|
||||
|
||||
|
Quote:
|
|
#12
|
||||
|
||||
|
Please Note:
Jay Moge is a non-member guest and is in no way affiliated with InterNACHI or its members.
Hay Dave... thanx home boy. (i'm trying to be "cool" like my kids) are ya down wit dat?? Fo-shizzle my-nizzle.
|
|
#13
|
||||
|
||||
|
I especially like the way they lay across the ductwork .
|
|
#14
|
||||
|
||||
|
Quote:
Wow, that photo blew right by me. I never paid attention to it. Without even considering the attachment clip requirements, I would have red flagged it either way. |
|
#15
|
||||
|
||||
|
Quote:
Bow wow wow, yippee yo, yippee yay. "Whassup Dog? |
![]() |
| Thread Tools | |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Do you put polybutylene in the Summary? | jfunderburk | Plumbing Inspections | 36 | 10/27/10 11:21 AM |
| Help - Polybutylene Pipes | Rick G | Plumbing Inspections | 39 | 2/12/09 9:16 AM |
| Bonding both hot and hold supply pipes | kshepard | Plumbing Inspections | 22 | 5/4/08 9:00 AM |
| Where do I put the Aquarium? | mcyr | Structural Inspections | 3 | 11/6/07 4:05 PM |
| Bonding Piping 101....Good To Know ! | pabernathy | Electrical Inspections | 37 | 4/28/07 12:25 PM |