International Association of Certified Home Inspectors
|
|||||||
| Florida Inspectors This is a place for Florida InterNACHI inspectors to discuss Florida inspection topics, wind mitigation inspections and 4-point inspections. |
![]() |
|
|
LinkBack | Thread Tools |
|
#1
|
|||
|
|||
|
With the typical Florida Clay Tile roof, do the insurance companies want proof of a Self adhering polymer modified bitumen roofing or is it a given?
|
| Need a home inspection in Pennsylvania? Check out InterNACHI's listing of Pennsylvania certified home inspectors. Or, find a home inspector anywhere in the world with our inspection search engine. |
|
#2
|
|||
|
|||
|
Documented proof!
|
|
#3
|
||||
|
||||
|
Not ever a given.
Good luck finding them applied as necessary or my opinion of necessary in S. Florida. Florida Licensed General Contractor Florida Licensed Home Inspector #299 Wind Mitigation Specialist Call 954-922-0584 or E-Mail Me For The Best Wind Mitigation Inspection in Florida at a Great Price
|
|
#4
|
||||
|
||||
|
Quote:
You will need the permit or the invoice with the phrase "peel and stick membrane", than manufacturers name and...I forgot, but something else. Maybe Michelle will chime in and post the third thing. The client may have to contact the roofer to get the information. You can also try to get a picture of the membrane in between the two pieces of plywood and send that with the report. Added with edit: For SWR you need: The roofers invoice that lists Peel & Stick Modified Bitumen SWR The Manufacturer of the Product The Brand Name Last edited by evandeven; 1/19/12 at 9:07 AM.. |
|
#5
|
||||
|
||||
|
Quote:
I am getting one from one of my customers as we speak. The documentation is available. Take the extra step and ask for it. |
|
#6
|
||||
|
||||
|
I do ask and am not wrong I just have almost never given that credit. Maybe twice.
Florida Licensed General Contractor Florida Licensed Home Inspector #299 Wind Mitigation Specialist Call 954-922-0584 or E-Mail Me For The Best Wind Mitigation Inspection in Florida at a Great Price
|
|
#7
|
||||
|
||||
|
Quote:
For SWR you need: The roofers invoice that lists Peel & Stick Modified Bitumen SWR The Manufacturer of the Product The Brand Name Submit that with the report. I just went through this with a client and he got the credit as he sent the invoice that had the above information to his insurance company. |
|
#8
|
|||
|
|||
|
This is bull****...what is the approved permit for...do you have the noa for the roofing paper???????????
|
|
#9
|
||||
|
||||
|
Quote:
Permits required |
|
#10
|
||||
|
||||
|
You do not need an SWR to meet code. SFBC does not allow it to be applied as required to meet SWR on the 1802.
John Shishilla State of Florida Licensed Home Inspector #21 Residential Contractor Accredited Claims Adjuster (ACA) Mold Assessor MRSA 1544 President of Fl Home & Insurance Inspectors Chptr VP of Nachi Managment Serving all of Baytree, Melbourne, Palm Bay, Cocoa, Rockledge, Viera, Satellite Beach, Indian Harbor Beach, Indialantic and surrounding areas. Honor Construction Inspection Service www.honorconstruction.com "Because details matter" 321-327-2950 |
|
#11
|
||||
|
||||
|
Quote:
aaaaaaaaaaaaaaaaaa the sky is falling we agree. Florida Licensed General Contractor Florida Licensed Home Inspector #299 Wind Mitigation Specialist Call 954-922-0584 or E-Mail Me For The Best Wind Mitigation Inspection in Florida at a Great Price
|
|
#12
|
||||
|
||||
|
Quote:
And, my reply was to the permit portion of the statement. The first thing that has to be done for any work that requires a permit is................................................ .......... wait for it................................................ ......... Apply for the permit! |
|
#13
|
|||
|
|||
|
Quote:
611.7.2 Roof secondary water barrier for site-built single-family residential structures. A secondary water barrier SHALL (key word) be installed using one of the following methods when roof covering is removed and replaced: 1. In either HVHZ or non-HVHZ regions, a) All joints in structural panel roof sheathing or decking shall be covered with a minimum 4-inch (102 mm) wide strip of self-adhering polymer modified bitumen tape applied directly to the sheathing or decking. The deck and self adhering polymer modified bitumen tape shall be covered with one of the underlayment systems approved for the particular roof covering to be applied to the roof. b) The entire roof deck shall be covered with an approved asphalt impregnated 30# felt underlayment or approved synthetic underlayment installed with nails and tin-tabs in accordance with Section R4402.7.2, R4402.7.3 or R4402.7.4 of the Florida Building Code, Residential. (No additional underlayment shall be required over the top of this sheet.) The synthetic underlayment shall be fastened in accordance with the manufacturer's recommendations. 2. Outside the High Velocity Hurricane Zone: a) The entire roof deck shall be covered with an approved self-adhering polymer modified bitumen sheet meeting ASTM D 1970 or an approved self-adhering synthetic underlayment installed in accordance with the manufacturer's installation instructions. No additional underlayment shall be required on top of this sheet for new installations. b) An underlayment system approved for the particular roof covering shall be applied with the following modification: (1) For roof slopes that require one layer of underlayment, a layer of approved asphalt impregnated ASTM D 226 Type I or Type II underlayment or approved synthetic underlayment shall be installed. The felt is to be fastened with 1-inch (25 mm) round plastic cap or metal cap nails, attached to a nailable deck in a grid pattern of 12 inches (305 mm) staggered between the overlaps, with 6-inch (152 mm) spacing at the overlaps. The synthetic underlayment shall be fastened in accordance with the manufacturer's recommendations. (2) For roof slopes that require two layers of underlayment, an approved asphalt impregnated ASTM D 226 Type I or Type II underlayment shall be installed in a shingle-fashion and lapped 19 inches (483 mm) and fastened as described above. An approved synthetic underlayment shall be installed in accordance with the manufacturer's installation instruction. (No additional underlayment shall be required over the top of this sheet.)Exceptions: 1. Roof slopes < 2:12 having a continuous roof system shall be deemed to comply with Section 611.7.2 requirements for a secondary water barrier. 2. Clay and concrete tile roof systems installed as required by the Florida Building Code are deemed to comply with the requirements of Section 611.7.2 for secondary water barriers.
Last edited by nhernandez1; 1/19/12 at 9:04 PM.. |
| Need a home inspection in Pennsylvania? Check out InterNACHI's listing of Pennsylvania certified home inspectors. Or, find a home inspector anywhere in the world with our inspection search engine. |
|
#14
|
|||
|
|||
|
Quote:
|
|
#15
|
|||
|
|||
|
Not sure, you can ck the AHJ. So much changes, it is hard to keep up ..
|
![]() |
| Thread Tools | |
|
|
Similar Threads
|
||||
| Thread | Thread Starter | Forum | Replies | Last Post |
| Wind Mit Experts | adeerey | Florida Inspectors | 21 | 12/23/11 3:49 PM |
| Flat roof section wind mit | wcampbell2 | Florida Inspectors | 62 | 4/25/11 10:07 PM |
| Corrected (revised) version of the Wind Mitigation Inspection Form. | gromicko | Florida Inspectors | 12 | 9/30/10 8:02 AM |
| Wind Mit Form | bgromicko | Florida Inspectors | 57 | 8/7/10 5:53 PM |
| Wind mitigation form Item #2 | cwagner | Florida Inspectors | 9 | 5/15/10 10:16 PM |