Brand new construction. 200 amp UG service. Does the ground wire typically have to pass through the 1/2" KO in conduit and/or be continuous and/or bonded to the meter base to the ground? This one came directly from the panel, underneath siding/sheathing to the ground.
Thanks in advance.