Get Started
Grow Your Business
More…
<
Show Menu
Join InterNACHI®
InterNACHI Inspection Image Gallery
/
Commercial
/
General
General Home Inspection Images
Definition of an Ambulatory Care Facility
Definition of an Atrium
Definition of an Open Mall Building
Definition of an Outpatient Clinic
Deformation of Commercial Structure
Dimensional Uniformity: Riser Height
Dimensional Uniformity: Tread Depth
Door Maneuvering Clearance: Forward Approach
Door Maneuvering Clearance: Hinge-Side Approach
Door Maneuvering Clearance: Latch Side Approach
Door Threshold Profile
Drip Leg
Duct Connections
Ducts
Electric Baseboard Clearance
Enclosed Parking Garage Ventilation
EPDM Roof Membrane Installation
Equipment and Appliance Elevation
Exhaust Fans for Commercial Kitchens
Exhaust Motor
Exhaust Termination Clearances for Ducts Serving Type I Hoods
Exhaust Termination Clearances for Ducts Serving Type II Hoods
Exit Components and Exit Discharge
Exit Stairway Notification Sign
Fire Damper
Fire Door Elements
Fire Door Inspection
Fire Resistive Walls and Floors
Flight of Stairs: Vertical Rise
Form Metal Decking
Fully-Adhered vs. Mechanically-Attached
Gas Pipe in Slab
Globally Harmonized System Pictograms
Grease Interceptor
Ground Source Heat Pump
Group E Occupancies: Storm Shelter Location
Guard and Handrail Heights
Handrail Profiles
Heat Pump: Cooling Cycle
Heat Pump: Heating Cycle
High Rise Building Heating and Cooling
High-Rise Building Height
High-Rise Sprinkler Systems and Emergency Systems
Horizontal Framing Member Loads
How Moment Frames Work
Hydromechanical Grease Trap
Interior Vapor Pressure: Cold Climate
Interior Vapor Pressure: Hot Climate
Landing Depth
Landing Depth Turning 90 Degrees or More
Level of Exit Discharge
Loading Dock: Foam Pad or Hood
Low-Slope Roof Drainage Systems: Interior Drain with Inverted Pyramid Slope
Low-Slope Roof Drainage Systems: Scupper Drains
Low-Slope Roof Drainage: Cricket and Saddle
Low-Slope Roof Interior Drainage
Low-Slope Roof Through-Wall Flashing (BUR)
Make-Up Air System
Maximum Occupancy Sign
Means of Egress: A Three Part System
Mechanical Equipment Stand on Low-Slope Roof
Membrane Ridging in Built-Up Roof (BUR)
Membrane Splitting in Built-Up Roof (BUR)
Metal Decking
Mid-Parapet Termination: Termination Bar
Minimum Stairway Headroom Clearance
Minimum Stairway Width
Modified Bitumen Installation, Two-Ply
Multi-Story Building
Multi-unit
Multi-unit
Noncombustible Materials
Nosing Projection Uniformity
Occupancy Load Table
Open Parking Garages
Open Parking Ventilation
Opening Limitations in Risers
Packaged Central System: Cutaway
Packaged Rooftop Unit (RTU): Cutaway
Parapet Termination: Underneath Metal Coping
Pipe Identification Chart and Examples
Pipe Identification Color Chart
Pitch Pan
Plumb, Level, Square, and Straight
Ponding on a Commercial Roof
Pre-Cast Concrete Members
Pre-cast Concrete Roof System
Pre-Stressed Concrete: Post-Tensioning Steel Rebar Strands
Pre-Stressed Concrete: Pre-Tensioning Steel Rebar Strands
Primary Structural Frame
Principles of Fire Resistance to Prevent Structural Collapse
Prohibited Handrail Profiles
Protected Membrane Roof System (PMR)
Proximity Hood
Rebar
Rebar
Rebar
Rebar
Recessed Wheelchair-Accessible Drinking Fountain
Refrigerant Chiller
« Previous
Next »
1
2
3