Based on the International Standards of Practice for Inspecting Radon Mitigation Systems
___ active sub-slab depressurization;Drain-Tile Depressurization System
___ passive sub-slab depressurization;
___ sump (pit) depressurization (active);
___ drain-tile depressurization;
___ sub-membrane depressurization;
___ hollow-block wall depressurization;
___ crawlspace depressurization; or___ heat-recovery ventilation.
Sub-Membrane Depressurization System___ The inspector noted that the drain pipes that extend to daylight were missing devices, such as one-way flow valves or water traps, that prevent outdoor air from entering the sub-slab area.
Hollow-Block Wall Depressurization System___ The inspector noted that the vapor retarder used for the sub-membrane depressurization system (passive or active) had seams that were lapped less than 12 inches, or edges that were not sealed to the walls, posts or other penetrations.
Crawlspace Depressurization System___ The inspector noted that the hollow-block walls had cracks, openings or open top-courses.
Heat-Recovery Ventilation (HRV) System___ The inspector noted that the crawlspace had the presence of asbestos-like material, or combustible fuel-served appliances located within the crawlspace or spaces adjacent to the crawlspace.
Piping and Fittings___ The inspector noted the area around the HRV system had the presence of asbestos-like material.
___ The inspector noted piping that is not PVC, ABS or downspout (outside).Piping Supports
___ The inspector noted piping subjected to weather or physical damage that was not Schedule 40.
___ The inspector noted pipe and fitting connections of different materials.
___ The inspector noted piping that wasn’t solid or rigid.
___ The inspector noted reducers that were installed in the direction of air flow.___ The inspector noted piping that was not continually sloped toward the suction point(s).
___ The inspector noted supports installed more than 6 feet apart on horizontal runs.Discharges___ The inspector noted supports installed more than 8 feet apart on vertical runs.
___ The inspector noted discharges less than 10 feet above ground level.Radon Fan
___ The inspector noted discharges less than 6 inches above a roof edge, rake or gable that its stack passed by.
___ The inspector noted discharges that exhausted less than 12 inches above a roof surface through which its stack pipe passed.
___ The inspector noted discharges that exhausted below the roof surface of the highest roof of the building.___ The inspector noted discharges within 2 feet directly above or less than 10 feet from a window, door or opening.
___ The inspector noted interior radon fans installed in occupied or conditioned spaces.Condensate Bypass
___ The inspector noted exterior radon fans installed underground.
___ The inspector noted radon fans that were not connected to the piping with removable couplings or flexible connections.___ The inspector noted radon fans that were not mounted vertically.
Electrical___ The inspector noted missing condensate bypass mechanisms on a system in a cold climate.
___ The inspector noted cord and plug assemblies supplying power to radon fans that were more than 6 feet in length.Condensate Drainpipes
___ The inspector noted cord and plug assemblies supplying power to radon fans that passed through walls, floors or ceilings, or were concealed within building components.
___ The inspector noted missing means of disconnect, such as a dedicated, labeled electrical breaker or switch, or an electrical plug cord.
___ The inspector noted means of disconnects not in sight of their radon fans.
___ The inspector noted missing grounded receptacles (required within 6 feet of radon fans installed under roofs).
___ The inspector noted missing GFCI receptacles (required within 6 feet of radon fans installed above roofs).___ The inspector noted missing electrical junction boxes (required within 6 feet of radon fan locations of both active and passive systems).
Monitoring Device___ The inspector noted condensate drainpipes that were not directed into condensate pumps, not directed into trapped floor drains, or did not have 6-inch or greater standing water-trap seals.
Labeling___ The inspector noted missing air-flow or pressure-monitoring devices, which are required to provide easily visible or audible indication of system failure or performance in active systems.
___ The inspector noted missing piping labels (required on each floor to identify piping as part of a radon system).
___ The inspector noted missing labels on the plastic vapor barrier (if installed).
___ The inspector noted labels that are illegible from a distance of 3 feet.
___ The inspector noted piping or vapor barrier labels that failed to display one the following: “Radon-Mitigation System,” “Radon-Reduction System,” “Radon System” or “Radon-Removal System.”
___ The inspector noted a missing main label that contains the mitigator’s name and contact information, date of installation, and a recommendation to test the building for radon every two years.___ The inspector noted a missing “Radon,” “Radon Fan” or “Radon System” label at the disconnect breaker controlling the electrical circuit to the radon fan.
This inspection was performed by: ____________________________________Signature: ____________________________________