The graphic shows a common type of panelboard with an integral main service disconnect. For this panelboard installation, there is a 3-wire service-entrance SEU conductor cable from the meter to the main panelboard. The cable has two ungrounded “hot” conductors and one bare, stranded, ungrounded “neutral” conductor. The bare, stranded, grounded “neutral” conductor connects to the neutral bus bar. The main service disconnect (the main disconnect breaker) is the master switch for the panelboard. It shuts off the power to everything downstream, including the hot bus bars and all breakers mounted to them. The MBJ connects the service neutral wiring to the grounding electrode conductor (GEC) and also to the service panelboard cabinet.
License
All images copyright © 2008-2026 the International Association of Certified
Home Inspectors, Inc. (InterNACHI). All rights reserved. InterNACHI grants
its members a non-exclusive, non-transferable worldwide license, as long as
they remain a member of InterNACHI. Non-members must
obtain written or email permission from InterNACHI
before using these images for any purpose. If you are an InterNACHI member or have received
written or email permission to use this image, you may download it in high resolution.
If you are aware of any person or entity using any InterNACHI image or intellectual property without
authorization, please contact InterNACHI.